Laserfiche WebLink
1P <br /> Environmental Review <br /> The Initial Study/Mitigated Negative Declaration (IS/MND} process requires analysis of all potential <br /> environmental impacts due to the Pian, and identifies mitigation measures for the impacts.The analysis <br /> revealed potential impacts to aesthetics and air quality. No other environmental factors will have potential <br /> significant impacts. The individual projects however may have localized impacts which will be considered <br /> when those individual projects are being developed. <br /> The (ISIMND� document, as required by law, was posted on the State's Clearinghouse web-site on <br /> November 2" , 2010 for a period of 30 days, and at the same time was circulated to the general public for <br /> comments. If the Planning Commission approves and makes a positive recommendation, The Board of <br /> Supervisors will consider adoption of the Plan (IS/MND) on January 25th,2011. <br /> San Joaquin County San Joaquin County Bicycle Master Plan Update <br /> Department of Public Works Page 3 <br />