W <br /> • <br /> Draft Supplemental Environmental Impact Report Page H-2 • <br /> Forward Inc. Landfill 2018 Expansion Project <br /> • <br /> addition, approximately 11 acres of currently permitted landfill disposal area in • <br /> the southern portion of the Forward Landfill would be relocated within the <br /> currently permitted landfill boundary due to realignment of the South Fork of • <br /> South Littlejohns Creek (also known as the South Branch of the South Fork of <br /> Littlejohns Creek). • <br /> • Increase the remaining landfill capacity by approximately 32.0 million cubic • <br /> yards (cy) to approximately 54.0 million cubic yards (cy). All of the increase • <br /> would be Class II landfill space and would extend the landfill closure date to • <br /> approximately 20391. <br /> • Relocate approximately 3,000 feet of the South Fork of South Littlejohns Creek <br /> (which currently traverses the landfill)to the southeastern boundaries of the site <br /> to provide additional separation of the creek from the landfill. The relocated • <br /> creek will be approximately 3,200 feet in length. <br /> • Allow cannery waste processing in areas of site that are not being used for • <br /> disposal at the time. • <br /> The Board of Supervisors certified the 2013 Forward Landfill Expansion Final • <br /> Environmental Impact Report however the project application required an override to • <br /> the Airport Land Use Plan by the County Board of Supervisors, which was not • <br /> approved. • <br /> In 2014, Forward proposed a smaller increase in permitted landfilling capacity that did not • <br /> include the previously proposed expansion of landfilling operations on the 184-acre • <br /> Brocchini parcel. This proposed increase in landfill acreage was entirely within the • <br /> boundary of the 567-acres permitted under the current land use permit(UP-00-0007/ER- • <br /> 00-0002)approved by the Board of Supervisors on April 8,2003. A Draft Supplemental EIR <br /> (DSEIR)was circulated for this proposed expansion in December 2014 and comment were • <br /> received,but Forward abandoned the project before the Final Supplemental EIR was <br /> completed. • <br /> The 2018 Expansion Project described in this Supplemental EIR is very similar to the • <br /> 2014 proposal. It has a smaller increase in permitted landfilling capacity that does not • <br /> include the any expansion of landfilling operations onto the Brocchini parcel. The • <br /> additional proposed landfill acreage is entirely within the boundary of the 567-acres • <br /> permitted under the current land use permit(UP-00-0007/ER-00-0002) approved by the <br /> Board of Supervisors on April 8, 2003. <br /> • <br /> The 2018 Expansion Project would make the following changes to the currently permitted • <br /> landfill: • <br /> • Landfilling of an 8.7-acre parcel in the northeast portion of the site within the • <br /> currently permitted landfill boundary. <br /> • <br /> 1 The 2013 FEIR estimated closure dates with and without that project of 2039 and 2021,respectively. <br /> However,2014 estimated closure dates with and without the 2012(previously proposed)project are 2045 • <br /> and 2026,respectively. <br /> • <br /> • <br /> • <br /> • <br />