Laserfiche WebLink
• <br /> . Draft Supplemental Environmental Impact Report Page II-3 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> • Landfilling of approximately 8.6 acres in the south area <br /> • The south area expansion would require realigning about 2900 feet of the South <br /> • Fork of South Littlejohn Creek to a 3300-foot alignment along the southern and <br /> • eastern boundaries of the site, along with a new bridge across the creek. <br /> • • The expansion would increase total landfill capacity by up to 8.420 million cubic <br /> • yards beyond currently permitted levels,which would increase the remaining Class <br /> II landfill capacity by approximately 8.42 million cubic yards (cy), from <br /> • approximately 16.6 million cy currently permitted to approximately 24.7 million cy. <br /> • Landfill expansion would allow disposal at the landfill to continue until <br /> • approximately 2036, a six-year increase from the current anticipated closure date of <br /> 2030. <br /> • Site operations would remain mostly as described in the 2013 EIR. The complete 2018 <br /> • Expansion Project, including the components that are unchanged, is summarized in <br /> + Chapter II, Project Description, of this SEIR. <br /> • C. ENVIRONMENTAL IMPACTS <br /> • <br /> • Table S-1,below, summarizes the environmental impacts of the proposed project. <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> r <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br />