Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page II-10 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> • The use of highly reflective surface materials in constructing structures on <br /> the site will be prohibited. <br /> Identified in This EIR: <br /> Mitigation Measure A.5: The project sponsor shall include downward <br /> shielding of new landfill lighting, and shall abide by any reasonable and <br /> feasible measures or regulations the Federal Aviation Administration (FAA) <br /> and Stockton Metropolitan Airport have to mitigate lighting impacts that <br /> could be cause by the proposed project, including reducing or eliminating <br /> lighting during foggy conditions and concurrently suspending operations <br /> that depend on the lighting. <br /> The Conditions of Approval for the proposed project shall include the <br /> requirement that the project sponsor, prior to construction, file a Notice of <br /> Proposed Construction or Alteration (Form 7460-1) with the Federal Aviation <br /> Administration. <br /> Mitigation Measure K.4 (2013 EIR) also applies to night lighting impacts. <br /> A.6. Potential conflicts Less than Significant. None required. Less Than <br /> with nearby land uses. Significant <br /> B. TRANSPORTATION <br /> AND CIRCULATION <br /> B.1. Potential Project Less than significant. None required. Less than <br /> Impact to LOS at Nearby Significant <br /> Intersections. <br /> Impact B.2. Potential I Less than significant. None required. Less than <br />