Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page II-12 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> to a less than significant level. In the worst case, the 2018 expansion project's <br /> contributions to cumulative impacts at these four intersections, as defined by <br /> County policy, would be considerable, and would be a significant unavoidable <br /> impact. <br /> Mitigation Measure B.7 would reduce the significant cumulative impact at the <br /> Austin/Arch Roads intersection to a less-than-significant level. <br /> Mitigation Measure B.7. (Revises 2013 EIR Mitigation Measure B.6). <br /> Improvements to Intersection 11, Arch Road/Austin Road, Southbound: The project <br /> shall contribute its fair share to the addition of one lane to provide one left-tum lane, <br /> two thru lanes, and one right-tum lane, as detailed in the TIA, Figures 12 and 13. <br /> B.8 Potential Cumulative Less than significant. None required. Less than <br /> Impact to mainline Significant <br /> Roadway Operations. <br /> B.9. Potential Less than significant. None required. Less than <br /> Cumulative Impacts at Significant <br /> Main Access Driveway. <br /> B.10. Potential Less than significant. None required. Less than <br /> Cumulative Impacts on Significant <br /> Bicycles. <br /> B.11. Potential Less than significant. None required. Less than <br /> Cumulative Impacts on Significant <br /> Public Transit. <br />• • • • • . . . . . . • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1 <br />