Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page II-39 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> performed by a qualified biologist. <br /> • If an occupied golden eagle nest is detected, a setback of 500 feet from the <br /> nesting area shall be established and maintained during the nesting season <br /> (i.e., normally approximately February 1 -June 30) for the period <br /> encompassing nest building and continuing until fledglings leave nests. <br /> • This setback applies whenever construction or other ground disturbing <br /> activities must begin during the nesting season in the presence of nests that <br /> are known to be occupied. <br /> • Setbacks shall be marked by brightly colored temporary fencing. <br /> White-tailed Kite <br /> The following Incidental Take Minimization Measures, as outlined in the SJMSCP, <br /> shall be followed: <br /> • Prior to the initiation of tree removals/pruning, ground clearing, grubbing, <br /> grading or excavation activities scheduled to occur during the nesting season <br /> (i.e., normally approximately February 15—September 15), a preconstruction <br /> survey shall be performed by a qualified biologist. <br /> • A setback of 100 feet from nesting areas shall be established and maintained <br /> during the nesting season for the period encompassing nest building and <br /> continuing until fledglings leave nests. <br /> • This setback applies whenever construction or other ground-disturbing <br /> activities must begin during the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be marked by brightly colored <br /> temporary fencing. <br /> Burrowing Owl <br />