Draft Supplemental Environmental Impact Report Page II-40 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> Consistent with the measures outlined in the SJMSCP and CDFG 2012, the following <br /> impact minimization measures shall be followed- <br /> • Consistent with the protocols outlined by the CDFG (2012 Appendix D), <br /> a "Take Avoidance Survey' shall be performed by a qualified biologist <br /> (as defined in CDFG 2012, page 5)no less than 14 days prior to the <br /> initiation of ground disturbance. A final survey shall be conducted 24 <br /> hours prior to ground disturbance. <br /> • Ongoing rodent control measures at the landfill facility shall conform to <br /> the guidelines outlined in the SJMSCP (Appendix A) (see Impact H.10, <br /> below). <br /> • The Project Proponent may plant new vegetation or retain existing <br /> vegetation entirely covering the site at a height of approximately 36" <br /> above the ground. Vegetation should be retained until construction <br /> begins;tall vegetation will discourage colonization of the site by <br /> burrowing owl. <br /> • Alternatively, if burrowing owls are not known or suspected on a <br /> project site and the area is an unlikely occupation site for red-legged <br /> frog, San Joaquin kit fox or tiger salamander, the Project Proponent may <br /> disc or plow the entire project site to temporarily close ground squirrel <br /> burrows and render the construction site temporarily unusable by <br /> burrowing owls. <br /> • During the breeding season (February 1 through August 31), occupied <br /> burrows shall not be disturbed in accordance with the following <br /> restrictions (CDFG 2012): <br /> o Between 1 April and 15 August, minimum setbacks from <br /> occupied burrows shall be 200 m (656 ft) for low disturbance <br /> levels, and 500 m (1640 ft) for medium and high disturbance <br />