Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page H-41 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> levels. <br /> o Between 16 August and 15 October, minimum setbacks from <br /> occupied burrows shall be 200 m (656 ft) for low and medium <br /> disturbance levels, and 500 m (1640 ft) for high disturbance <br /> levels. <br /> o Between 16 October and 31 March, minimum setbacks from <br /> occupied burrows shall be 50 m (164 ft) for low disturbance <br /> levels, 100 m (328 ft) for medium disturbance levels and 500 m <br /> (1640 ft) for high disturbance levels. <br /> • Burrow exclusion is a technique of installing one-way doors in burrow <br /> openings during the non-breeding season to temporarily exclude <br /> burrowing owls, or permanently exclude burrowing owls and close <br /> burrows after verifying burrows are empty by site monitoring and <br /> scoping. During the non-breeding season (September 1 through January <br /> 31) burrowing owls occupying the project site may be evicted from the <br /> project site by passive relocation as described by the (CDFG(2012). <br /> Burrow exclusion and closure is not permitted during the breeding <br /> season. <br /> Loggerhead Shrike <br /> Loggerhead shrike has been observed foraging in the project area. Participation in <br /> the SJMSCP affords the project proponent Incidental Take authorization for <br /> loggerhead shrike pursuant to ESA,CESA and CEQA. Although little suitable <br /> nesting habitat is present on site, as outlined in the SJMSCPS, the following <br /> incidental take avoidance measures shall be followed: <br /> • Prior to the initiation of ground clearing, grubbing, grading or excavation <br /> activities, a scheduled to occur during the breeding season (i.e., February 1 - <br /> SJMSCP Chapter 5.2.4.18 <br />