r <br /> Draft Supplemental Environmental Impact Report Page III-32 <br /> Forward Inc.Landfill 2018 Expansion Project <br /> main perimeter 18-inch gas collection header with associated lateral pipelines connected to the • <br /> extraction wells. The LFG is then combusted at the flare station located at the northeast comer of • <br /> the site or the adjacent Ameresco Landfill Gas to Energy Facility(LFGTE). The flare station <br /> consisted of two enclosed ground flares located at the northeast comer of the landfill, with a <br /> combined permitted capacity of 5,600 standard cubic feet per minute(cfm). Currently,the LFG <br /> flares combust approximately 2,500 cfm,and the Ameresco LFGTE facility utilizes up to • <br /> approximately 1,400 cfm for electrical generation. It is anticipated that the newly operational <br /> Ameresco Landfill Gas to Energy plant(see G.Recent and Proposed Projects at the Forward <br /> Landfill,below)will eventually use most or all of the gas from the combined collection system. <br /> Any remaining gas will be flared as needed to maintain compliance. • <br /> Dust <br /> Dust is controlled at the landfill by (1)maintenance of haul roads (paving, grading, and • <br /> watering); (2) application of fine water spray (minimum of twice daily) on the active . <br /> soil-covered work areas, soil excavation areas, and soil stockpile areas where conditions may <br /> result in fugitive dust; (3)application of organic dust suppressant, and (4) limiting the speed of <br /> all on-site vehicles to less than those that would cause visible dust emissions behind the vehicle. <br /> For dust control purposes, surface-water runoff or on-site well water is applied to all main • <br /> access and haul roads and unpaved equipment-parking areas at least once per day. All-weather • <br /> surfacing is applied to any unpaved road segment that carries 50 or more vehicle trips per day <br /> continuously for more than thirty days. <br /> The track-out of mud and dirt onto Austin Road is limited by having an approximately 850-foot <br /> long paved exit road that allows mud and dirt to drop off before exiting the site, removing the <br /> mud and dirt from the interior paved road and Austin Road on a daily basis, and use of a wheel <br /> washer. After the 2013 EIR was prepared, the existing tire wash system at the site's main <br /> driveway for vehicles exiting the site was replaced by an improved system to remove sediment • <br /> from tires and undercarriages, and to prevent sediment from being transported onto public <br /> roadways. The new truck wash system is similar to the"Entrance/Outlet Tire Wash TC-3- <br /> described in the California Department of Transportation, "Caltrans Storm Water Quality <br /> Handbooks Construction Site Best Management Practices Manual", Section 6, dated March 1, • <br /> 2003. In the 2013 EIR, this tire washing system was described as part of the previously • <br /> proposed project. <br /> Odor <br /> Odor is controlled at the landfill by (1) timely placement of daily, intermediate and final soil <br /> cover over the refuse fill; and (2) planting and maintenance of a vegetated cover on completed <br /> fill slopes. <br /> Air Quality Monitoring <br /> Landfill Gas Monitoring <br />