• <br /> Draft Supplemental Environmental Impact Report Page III-34 • <br /> Forward Inc. Landfill 2018 Expansion Project <br /> • <br /> regulatory requirements. The proposed landfill expansion refuse fill grades meet both State and • <br /> Federal regulatory criteria under both static and seismic conditions 10 • <br /> The Title 27 regulations governing landfills and Forward's WDRs require a minimum five-foot • <br /> separation between wastes or leachates and the highest anticipated elevation of underlying • <br /> groundwater(including the capillary fringe) or the installation of an engineered alternative, such • <br /> as a subdrain. The regional groundwater in the greater Stockton area, including the vicinity of the <br /> Forward Landfill,has been overdrawn for many years and has shown a clear pattern of decreasing • <br /> groundwater levels. Current groundwater levels at the landfill are approximately 14 to 30 feet • <br /> below mean sea level (MSL). Based on a review of historic groundwater records, the maximum • <br /> high groundwater elevation underlying the southern and northeastern development area is • <br /> approximately four feet and ten feet below MSL,respectively. The minimum base grades for the <br /> proposed landfill development area have been developed to provide for the required 5-foot • <br /> separation between historic high groundwater and refuse. • <br /> The projected total remaining airspace for the Forward Landfill, as of January 2017,was <br /> approximately 16.6 million cubic yards(mcy). The proposed expansion would add approximately • <br /> 8.42 mcy of disposal airspace,which would allow disposal at the Forward Landfill to extend to <br /> 2036, from the current anticipated closure date of 2030. While all of the proposed expansion would • <br /> be Class II landfill space,it is anticipated that Class III waste would be disposed in the expansion • <br /> areas along with Class II waste. <br /> • <br /> The proposed 2018 Expansion Project would add 8.42 million cy of landfill capacity, compared to <br /> the 32 million cy in the previously proposed (2013)project. The projected landfill closure date • <br /> under the 2018 Expansion Project is 2036, compared to 2039" for the previously proposed project. . <br /> The 2018 Expansion Project would not entail putrescible waste (waste streams other than <br /> concrete, rock, asphalt, wood and yard waste) in the Outer Approach of the Stockton <br /> Metropolitan Airport, expansion of landfilling operations to within 10,000 feet of the end of the • <br /> usable runway of the Stockton Metropolitan Airport, or expansion of landfilling operations on • <br /> to any parcels of land under Williamson Act contract. • <br /> Relocate South Fork of South Littlejohns Creek • <br /> • <br /> To create a contiguous disposal area and optimize landfill airspace, an approximately 3,000-foot • <br /> reach of the South Fork of South Littlejohns Creek would be relocated to a new 3,400-foot long • <br /> reach to be constructed along the eastern and southern boundaries of the landfill (see Figures III.C- <br /> 4, IILC-5, and III.0-6). The existing creek traversing the landfill is generally a trapezoidal channel • <br /> with 10-to 12-foot banks and a 10-to 15-foot bottom width. The channel measures, on average, <br /> 60 feet from bank top to bank top. This equates to a 4.13-acre creek zone. According to the • <br /> °GLA,Inc., Geotechnical Investigation Report,Forward Landfill Expansion, February 2008. • <br /> The 2013 FEIR estimated closure dates with and without that project of 2039 and 2021,respectively. It • <br /> should be noted that landfill closure dates are approximate and can vary greatly based on many factors • <br /> such as the economy and density of wastes being disposed. • <br /> • <br /> • <br /> • <br /> • <br />