Laserfiche WebLink
• <br /> • <br /> • Draft Supplemental Environmental Impact Report Page IV.A-19 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> As discussed under"San Joaquin County Zone Classification', above, the proposed project <br /> would be consistent with the site's AG-40 zoning. The proposed relocation of the South Fork of <br /> South Littlejohns Creek would relocate, without substantially altering, the open space and <br /> riparian habitat values of the existing alignment of the South Fork. In addition, by purchasing <br /> • off-site mitigation,the project would enhance open space and riparian habit at the mitigation <br /> • site, as discussed in Section F. Biological Resources. For these reasons, the proposed project <br /> would not conflict with goals, policies, and implementation measures of the General Plan. <br /> • General Plan Solid Waste Disposal Policies <br /> The proposed project would not conflict with Implementation Program IS-J of the San Joaquin <br /> County General Plan, which calls for mandatory waste collection and recycling. <br /> General Plan Agricultural Land Policies <br /> The proposed project's consistency with agricultural land policies is discussed in Impact A.2, <br /> • below. <br /> General Plan Fire Safety and Law Enforcement Policies <br /> The proposed project would not obviously conflict with the Fire Safety goal and policies of the <br /> • General Plan Public Health and Safety Element, including Policy PHS-4.1, which calls for a <br /> Community Wildfire Protection Plan, and Policy PHS-4.6, which advocates coordination among <br /> fire prevention agencies. <br /> • As discussed in I. Public Services and Utilities, Setting, Fire Protection and Emergency Medical <br /> • Services, and Impacts I.1, I.2, and I.3, the proposed project would be located within 4.0 miles of <br /> a fire station (Policy 4) and,incorporating mitigation measures identified in this SEIR, would <br /> provide adequate access and water supply (Policies 2 and 5). <br /> General Plan Hazardous Materials and Wastes Policies <br /> As discussed in E. Public Health and Safety,the proposed project, including mitigation <br /> . measures identified in this SEIR, would not obviously conflict with the Hazardous Materials <br /> • and Wastes goal and policies of the General Plan Public Health and Safety Element, including <br /> Policy PHS-7.2, which calls for avoidance of environmental contamination from hazardous <br /> materials;Policy PHS-7.3, which calls for appropriate use, storage, and disposal of hazardous <br /> is materials;Policy PHS-7.5, which calls for safe location of hazardous material use, storage, and <br /> • disposal:; and Policy PHS-7.9,which requires public disclosure of hazardous materials and <br /> • wastes. <br /> As discussed in E. Public Health and Safety and G. Hydrology and Water Quality, the proposed <br /> project would include mitigation measures to address air, water, and soil contamination issues <br /> • (Policy 7.2), and would be located away from population centers (Policy 7.5). The project would <br /> • comply with hazardous waste laws and regulations (Policies 7.3 and 7.9). <br />