Laserfiche WebLink
• <br /> • <br /> Draft Supplemental Environmental Impact Report Page IV.0-5 • <br /> Forward Inc. Landfill 2018 Expansion Project • <br /> • At least three residences are along Austin Road, between Arch Road and the project driveway, • <br /> the closest of which is approximately 70 feet from the road centerline; • <br /> • Two residences are along Austin Road, south of the project driveway, the closest of which is • <br /> approximately 110 feet east of the road centerline; • <br /> • At least eight residences are along French Camp Road, west of Austin Road, the closest of • <br /> which is approximately 50 feet from the road centerline; • <br /> • At least ten residences are along French Camp Road, east of Austin Road, the closest of which is • <br /> approximately 80 feet from the road centerline; and • <br /> • California Health Care Facility, west of Austin Road. The facility is approximately 280 feet • <br /> from the road centerline and 2,500 feet northwest of the northeast expansion area. • <br /> A residential structure (9690 Austin Road) is also along Austin Road approximately 1,300 feet south- • <br /> southeast of the northeast expansion area. It is directly east of the Forward Landfill main entrance. • <br /> However, this structure is currently vacant and lacking electricity and plumbing, and so cannot be • <br /> occupied at this time. <br /> • <br /> Impacts • <br /> Impact significance under CEQA is evaluated relative to the existing environment. For the purposes of • <br /> this analysis,the"existing noise environment"is the current noise environment,which includes the • <br /> existing operational conditions at the landfill(i.e., approximately 233 trucks per day). This section • <br /> includes a summary of impacts and mitigations considered in the 2013 EIR, and has been updated to • <br /> include impacts and mitigations that are new or have been substantially altered by changes in the <br /> proposed project. To facilitate review of the section and comparison of analyses between the 2013 EIR • <br /> and this document, the heading for each impact or mitigation measure reflects whether that impact is • <br /> the same, revised, replaced, or new. • <br /> Standards of Significance <br /> • <br /> Under ambient conditions, most people cannot distinguish a change in the noise environment that • <br /> differs by less than 3 dBA between the pre- and post-project exposure. A clearly perceptible increase in • <br /> noise level differences occurs around +5 dBA. The operational noise impact studies prepared for the • <br /> 1993, 1994, 2000, and 2002 EIRs for the Forward and Austin Road landfills adopted a+5 dBA increase <br /> as a significant noise impact. Subsequent to those studies, ambient levels in the area have increased. • <br /> For the purposes of this analysis, the noise impact from any new landfill traffic would be potentially • <br /> significant if it would increase exterior noise levels by at least 5 dBA or more at any of the nearby • <br /> residential land uses that are currently at or below the County's maximum allowable Ldn noise <br /> exposure level of 65 dBA for transportation sources (see Table IV.0-2). • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br />