Laserfiche WebLink
W <br /> • <br /> • Draft Supplemental Environmental Impact Report Page IV.G-24 <br /> • Forward Inc. Landfill 2018 Expansion Project <br /> The impact from the loss of direct infiltration over the expansion area is considered to be less <br /> 0 than significant. <br /> • Mitigation Measure G.7: None required. <br /> Impact G.8. Increased sedimentation during the construction phase of the relocation of the <br /> . South Branch of South Littlejohn Creek. <br /> Construction and operation of the relocated South Branch of South Littlejohn Creek channel <br /> could result in additional sedimentation and surface water quality impact during the <br /> construction phase and shortly thereafter if appropriate BMPs to minimize such impact are not <br /> • adhered to. Constructing the Creek alignment during the dry season would be minimize any <br /> • sedimentation and water quality impact. <br /> Mitigation Measure G.8: Implement the proposed Questa Engineering design specifications <br /> • and standard construction BMPs during the construction phase of the South Branch of Sough <br /> • Littlejohn Creek realignment. Construction of the realigned creek channel shall be <br /> implemented during the dry season. <br /> • The proposed mitigation would reduce potential impact of sedimentation from the proposed <br /> • creek alignment to a less-than-significant level. <br /> 40 Impact G.9: The proposed expansion would result in the removal of existing groundwater <br /> • monitoring wells, which could hinder early detection of potential groundwater <br /> • contamination. <br /> Currently, groundwater monitoring wells MW-17, MW-18, and MW-19 are located in the <br /> • planned area of WMU FU-19. The need to relocate these monitoring wells was addressed <br /> • previously in the 2013 EIR(as well as earlier EIRs) and found to have a less-than-significant <br /> impact once mitigated. The mitigation measure required the installation of replacement wells <br /> for two of the three wells. The well closures and replacements were approved by the RWQCB in <br /> • March 2018, and are therefore considered part of the proposed project. Therefore, the <br /> • loss/relocation of monitoring wells is considered a less-than-significant impact. <br /> Mitigation Measure G.9: None required. <br />