Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page IV.0-8 ' <br /> Forward Inc.Landfill 2018 Expansion Project <br /> Location Time Period Ldn&Leg (dBA) Noise Sources ' <br /> 56 feet east from up to 51 dB. Nearby sprinkler was <br /> center of Austin Rd. up to 47 dB. <br /> Site 4:Austin Road June 5, 12:00 24-hour Ldn's= Unattended noise measurements do ' <br /> at Lynch Rd.,59 a.m. through 67,68,68 not specifically identify noise <br /> feet east from June 7, 11:59 sources. <br /> center of Austin Rd. p.m.,2018 Hourly average <br /> Tuesday- Leq's ranged <br /> Thursday from: <br /> 72-hour 49-66 <br /> measurement ' <br /> Site 4:Austin Road June 4,2018 5-minute results: Birds chirping and heavy-duty <br /> at Lynch Rd.,59 12:15—12:25 Leq's=58, 64 trucks and other traffic along Austin ' <br /> feet east from p.m. L90's=41,41 Rd. Maximum noise levels of 80 dB <br /> center of Austin Rd. were from heavy truck pass-bys. <br /> Background noise was less than 41.5 <br /> dB. ' <br /> Site 5:Northeast June 4,2018 5-minute results: Many heavy trucks and autos. <br /> corner of Austin 2:48—2:58 p.m. Leq's=72, 71 Trucks braking at intersection ' <br /> Rd. at Arch Rd., L90's=61, 60 resulted in Lmax of 88 dB. Trucks <br /> near the entrance of moving at slow speeds were 68-79 <br /> BNSF Intermodal. dB. Autos were 56-81 dB. <br /> 50 feet east from ' <br /> center of Austin Rd. <br /> Site 6: June 4, 2018 5-minute results: Only two vehicles on Newcastle ' <br /> Approximately 350 2:23—2:33 p.m. Leq's=55,52 Road during measurements(70 dB, <br /> feet southeast of L90's=47,45 58 dB). Airplanes were up to 62 dB. <br /> 7833 Newcastle Rd., Wind was up to 57 dB. Beeping <br /> and 60 feet east from landfill trucks was less than 43 ' <br /> from the center of dB. Could hear some traffic on <br /> Newcastle Rd. Hwy 99. <br /> Between the <br /> residence and the ' <br /> landfill. <br /> The revised project includes the development of expansion areas within the permitted landfill ' <br /> boundary,but does not include the previously proposed horizontal expansion onto the adjoining 184- <br /> acre Brocchini property. Eliminating the 184-acre expansion area would reduce construction noise ' <br /> impacts by eliminating noisy construction activities on this property compared with the 2013 project. <br /> Construction noise impacts of the revised project would remain less than significant. <br /> Impact C.2. Truck Traffic Noise Impacts (Revises 2013 FEIR Impact C.2.) ' <br /> The 2013 EIR determined that noise level increases attributed to the project would exceed the ' <br /> significance criteria at residential properties along each of the five roadway segments throughout the <br /> project area where residences would be most affected by the project. The revised project would result <br /> I <br />