My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011836
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
PA-1800090
>
SU0011836
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 10:35:38 AM
Creation date
9/4/2019 10:04:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011836
PE
2656
FACILITY_NAME
PA-1800090
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
20106003, -05, 18115007, -16
ENTERED_DATE
6/26/2018 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
RECEIVED_DATE
8/15/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\APPL.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\EHD COND.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\DRAFT SEIR-09-2018.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\EIR-07-2018.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft Supplemental Environmental Impact Report Page IV.D-19 <br /> Forward Inc. Landfill 2018 Revised Project <br /> • All land clearing, grubbing, scraping,excavation, land leveling,grading, cut and fill, <br /> and demolition activities shall be effectively controlled utilizing application of water or <br /> by presoaking. <br /> • When materials are transported offsite, all material shall be covered, or effectively <br /> wetted to limit visible dust emissions, and at least six inches of freeboard space from the <br /> top of the container shall be maintained. <br /> • All operations shall limit or expeditiously remove the accumulation of mud or dirt from <br /> adjacent public streets at the end of each workday.However,the use of blower devices <br /> is expressly forbidden, and the use of dry rotary brushes is expressly prohibited except <br /> where preceded or accompanied by sufficient wetting to limit the visible dust emissions. <br /> • Following the addition of materials to,or the removal of materials from, the surface of <br /> outdoor storage piles, said piles shall be effectively stabilized utilizing sufficient water <br /> or chemical stabilizer/suppressant. <br /> • Any site with 150 or more vehicle trips per day shall prevent carryout and trackout. <br /> Enhanced and additional control measures for construction emissions of PMlo shall be <br /> implemented where feasible.These measures include: <br /> • Limit traffic speeds on unpaved roads to 15 mph by signage and electronic speed <br /> monitoring devices. <br /> • Install sandbags or other erosion control measures to prevent silt runoff to public <br /> roadways from sites with a slope greater than one percent. <br /> • Install wheel washers for all exiting trucks,or wash off all trucks and equipment leaving <br /> the site. <br /> • Install wind breaks at windward side(s)of construction areas. <br /> • Suspend excavation and grading activity when winds exceed 20 mph. <br /> • Limit area subject to excavation, grading, and other construction activity at any one <br /> time. <br /> The applicant shall implement feasible control measures during construction to mitigate NO,, <br /> and VOC emissions from construction equipment,which may include: <br /> • Require construction equipment used at the site to be equipped with <br /> catalysts/particulate traps, or Tier 4 diesel engines to reduce particulate emissions. <br /> T-14e a ,..,,.alt's+„A..apsr-equi-veNhe.,r.,,.0„144 1„400 1414.,,.diesel fue! (15 j919m). Currently, <br /> CARB has verified a limited number of these devices for installation in several diesel <br /> engine families to reduce particulate emissions.At the time bids are made, contractors <br /> must show that the diesel-fueled construction equipment used is equipped with <br /> particulate filters,_catalysts, or Tier 4 diesel engines, or prove why it is <br /> infeasible. <br /> • Use alternative fueled construction equipment,where feasible. <br /> • Replace fossil-fueled equipment with electrically driven equivalents(provided they are <br /> not run via a portable generator set). <br />
The URL can be used to link to this page
Your browser does not support the video tag.