Laserfiche WebLink
Draft Supplemental Environmental Impact Ropef t <br /> Forward Landfill Fxpanslon <br /> Oclaber 22,2016 <br /> Page 2 of 3 <br /> (5) The landfill expansion would allow disposal at the landfill to continue until approximately <br /> 2036, a six-year fnorease from the current anticipated closure date of 2030. <br /> The DSEIR determined that lhe,proposed project after mitigation would have the following <br /> s�tri Qant pnd unavoidable adverse Impacts: <br /> Project,traffic yrould contribute to an unacceptable Level of Service under 2035 <br /> cumulative conditions at the intersection of Austin Road and Arch Road, SR 99 and Arch <br /> Road, and SR 99/Mariposa Road S5 Ramp under cumulative conditions. <br /> (2) The project would contribute to a cumulatively significant Increase in air pollutant <br /> emissions. <br /> (3) The increase in extent and mass of the proposed project would constitute a significant <br /> visual impact. <br /> (4) The project would result In significant and unavoidable project generated traffic noise on <br /> Austin Road. <br /> (5) The project's truck traffic would contribute to significant and unavoidable cumulative <br /> traffic noise on Austin Road. <br /> COMMENTS <br /> Ca;Recycle staff's comments on the proposed project are listed below, Where a specific <br /> location in the document is noted for the comment, please ensure the comment is addreseod <br /> throughout all sections of the Draft IS/ND, in addition to the specific locatinn noted. <br /> Comments for the DSEIR are summarized in the table below., <br /> Cha terlSectlon Pa a and Location Comment __ _ _ <br /> Tho maximum elevation of refuse fill in the <br /> I N 35 ariditiona1 development areas wrAM he <br /> O approximately 190 feet above mean sea level. <br /> The peak elevation of the new development <br /> arias including final cover should stay below <br /> the cu, <br /> u rently permitted maximum elevation of <br /> 210 feat above mean sea level, <br /> IV B-17 It is unclear if h is intended for the compost <br /> 0 activity to continue to operate somewhere else <br /> 2 on the landfill or If the activity will cease. <br /> Please clarify. <br /> Solid Waste Facilities Permit <br /> Furthermore, a change to the disposal facility design or operation such as a change in the <br /> estimated closure date and design capacity will require a revislon to the solid waste facilities <br /> 0 permit. Prior to implementation of such a change, the operator shall submit,an application <br /> package for a solid waste facifitios permit revision pursuant to 27 CCR, section 21570 which <br /> shall be processed by the Local Enforcement Agency pursuant to 27 CCR,section 21650. <br /> Sold Waste Regulatory Oversi-ght <br />