My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011836
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
PA-1800090
>
SU0011836
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 10:35:38 AM
Creation date
9/4/2019 10:04:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011836
PE
2656
FACILITY_NAME
PA-1800090
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
20106003, -05, 18115007, -16
ENTERED_DATE
6/26/2018 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
RECEIVED_DATE
8/15/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\APPL.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\EHD COND.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\DRAFT SEIR-09-2018.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\EIR-07-2018.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft Supplemental Environmental Impact Report Page VIII-90 <br /> Forward Inc.Landfill 2018 Expansion Project <br /> While some mitigation measures have changed, the severity of most of the impacts <br /> addressed in this document have been reduced or not materially changed from the FEIR, <br /> which addressed a larger project. The commenter has not provided a reference to any <br /> significant new or significantly increased impacts that would be caused by the revised <br /> project compared with the project analyzed in the prior certified EIR,or any new <br /> circumstances or mitigation measures that would substantially reduce any impacts <br /> analyzed in the prior EIR. All significant impacts described in the prior EIR will still be <br /> significant based on the analysis in this Supplemental EIR. <br /> The current document includes updated discussions of all items that may have ' <br /> substantially changed,while referencing and explaining why the remaining topics have <br /> not changed since the issuance of the FEIR. There is no new information of substantial <br /> importance regarding new or significantly increased environmental impacts of the ' <br /> revised project not analyzed in the prior EIR. Nor are there any new mitigation <br /> measures of significant impacts or alternatives identified in the prior EIR previously <br /> found not to be feasible that(a)are now feasible and (b)that would substantially reduce <br /> one or more significant effects on the environment,but(c)the project proponent <br /> declines to adopt.The contents of this Supplemental EIR demonstrates that impacts <br /> analyzed for the prior project will either be the same or less severe and less significant <br /> than those impacts analyzed in the prior EIR.Further, the project proponent has <br /> accepted all mitigation measures for significant impacts of the revised project and that <br /> are recommended in this EIR. <br /> The commenter does not provide information that any of the grounds described above, <br /> that require preparation of a Subsequent EIR,have occurred. <br /> In addition,per CEQA Guideline§15163,the lead agency may choose to prepare a <br /> supplement to an EIR rather than a subsequent EIR if: <br /> (1) Any of the conditions described in Section 15162 would require the preparation of a <br /> subsequent EIR, and <br /> (2)Only minor additions or changes would be necessary to make the previous EIR <br /> adequately apply to the project in the changed situation. <br /> The prior EIR certified by the County Board of Supervisors was for a 184-acre expansion <br /> of the Forward landfill on an undisturbed parcel adjacent to the existing Forward <br /> landfill, which would have added 54 million cubic yards of additional disposal capacity <br /> to the landfill. The revised project that is the subject of this Supplemental EIR is for only <br /> a 17.3 acres acre expansion located within the existing disturbed area of the landfill that <br /> will add only 8.1 million cubic yards of disposal capacity.Therefore,in all respects the <br /> revised landfill expansion project is a smaller alternative project that will have less <br /> severe environmental impacts that the original 184-acre expansion. Specifically, <br /> 1. The revised project involves only 9.4 percent of the total acreage of the prior <br /> project; <br />
The URL can be used to link to this page
Your browser does not support the video tag.