Laserfiche WebLink
1 <br /> Forward Inc. Landfill Expansion Project MMRP ' <br /> recharge program does not specifically address the loss of infiltration within the expansion <br /> area it is designed to generally meet the intent of the water district to minimize overdrafting. ' <br /> 62 Proposed as Pai4 of the 2013 PFojeet <br /> pfografn being eafried out by Forward ine. does not speeffieally address the less 6 <br /> infiltfation within the expansion afea it is designed to generafly meet the intent of the <br /> 63. Identified in This SEIR(G.8): <br /> Implement the proposed Questa Engineering design specifications and standard construction <br /> BMPs during the construction phase of the South Branch of Sough Littlejohns Creek <br /> realignment. Construction of the realigned creek channel shall be implemented during the <br /> dry season. <br /> 64. Forward 2002(F4): <br /> Continued monitoring of the effectiveness of mitigation measures for leachate shall be <br /> performed by the responsible regulatory agencies (currently the RWQCB and,for the WMU- <br /> A, the DTSC). These agencies keep abreast of state-of-the-art information on leachate <br /> generation mechanisms and appropriate mitigation. If, in the future, monitoring <br /> demonstrates that the procedures above were insufficient to mitigate the effects of landfill- <br /> generated leachate, the agencies will, as appropriate, require additional mitigation t <br /> measures. <br /> 65. Forward 2002(F7)(superseded by Measures 60-62, above): <br /> pumped by the fefmer-., ,.lt. ral well is used onsite;thus, some of it will in fihfae tt,..,.,,,.t, <br /> b <br /> the unlined pafts of the site and migrate baek to the gr-eundwater aquitef ffem where it was <br /> whieh beth r-eehar-ges aquifers below and moves <br /> 1 <br /> e <br /> of <br /> T feete.l b .-fitheb.,.1.yateofn the groundwater- .,t,-aetion system : pr.. ., ,l p eto be in fi r- te.1 ' <br /> baek to the ager tl3retigh an inflitfation basin(AFE,2001 B,2002a)lee.,tea near elt <br /> MW 11. The infiltfation basin wetild impr-ove feeharge to the leeal aquifer-and is also <br /> designed to er-eate ., 1 ydr- ulie ba er t..inhibit furthe eftb... ,..1 migration;f the <br /> gfeundwater plume. The RWQCB let4er-to ForwaFd dated Mafeb 11,2002 agreed to alae.. <br /> for-theif veb.arge Y e.1.,(A ltem..tiye 1 1)to ge fnfwar-d...;tb.e..t A lte.-.,.,tiye 3 (exten ell <br /> VOC eeneentrations do not a4enuae at a fate that is aeeeptable to the RWQC=B then --- I <br /> B f.1 will.. e that A ltemetiye 2 er seffie vafiant en A ltefna five 2 be implemented. The <br /> be a side.-e.7 <br /> vc-cviroa'acrcQ: <br /> 66.Forward 2002(F.9) ' <br /> Replacement wells (as well as additional wells north of the Austin Road Landfill to better <br /> define the leading edge of the plume)shall be installed to mitigate against the loss of old <br /> wells as presented in the JTD currently under review by the RWQCB. The RWQCB must ' <br /> approve the JTD's plans for the number and location of the new wells as part of their <br /> approval process, which is separate from the EIR approval process. <br /> f <br /> Page 20 <br /> a <br />