My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011836
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
PA-1800090
>
SU0011836
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 10:35:38 AM
Creation date
9/4/2019 10:04:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011836
PE
2656
FACILITY_NAME
PA-1800090
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
20106003, -05, 18115007, -16
ENTERED_DATE
6/26/2018 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
RECEIVED_DATE
8/15/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\APPL.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\EHD COND.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\DRAFT SEIR-09-2018.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\EIR-07-2018.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Forward Landfill 2018 Expansion Project—Mitigation Monitoring and Reporting Program Checklist <br /> Implementation <br /> Mitigation Measure Implementation Monitoring Confirmation <br /> Comments <br /> Landfill cell anchor Responsibility:Landfill operator Responsibility: RWQCB <br /> trenches Timing:included with the Improvement Plan Timing: Prior to approval of <br /> Waste Discharge Requirements(WDRs) <br /> 58. Creek channel Responsibility:Landfill operator. Responsibility: County Public Works Department,CDFW,RWQCB <br /> improvements Timing:included with Creek Relocation Plan Timing: Prior to approval of Landfill Design Plans <br /> 59. Design for interface Responsibility:Landfill operator Responsibility:RWQCB and CIWMB <br /> at expansion cells Timing:Letter from RWQCB shall be Timing:Prior to approval of <br /> included with the Improvement Plan Waste Discharge Requirements(WDRs) <br /> Design liner for Responsibility:Landfill operator Responsibility:RWQCB and CIWMB <br /> differential settlement Timing:Prior to submission of Landfill Timing: Prior to approval of Landfill <br /> Design Plans Design Plans <br /> Review liner design Responsibility:Landfill operator Responsibility: RWQCB and CIWMB <br /> in JTD update Timing:Prior to submission of Landfill Timing:Prior to approval of Landfill <br /> Design Plans Design Plans <br /> 60. Supply residents Responsibility:Landfill operator Responsibility:County Environmental Health Department <br /> with bottled water Timing: Ongoing Timing: Ongoing <br /> Municipal supply line Responsibility: CYA Responsibility: County Environmental Health Department <br /> will serve CYA Timing:Ongoing Timing: Ongoing <br /> Sample additional Responsibility:Landfill operator Responsibility: RWQCB <br /> off-site wells Timing:At least twice a year Timing:At least twice a year <br /> Remediation measures Responsibility:Landfill operator Responsibility: RWQCB <br /> Timing:Ongoing Timing:Upon submittal of engineering study;then Quarterly <br /> 61. See#62,below <br /> 62. Recharge of treated Responsibility:Landfill operator Responsibility: RWQCB <br /> groundwater Timing: Ongoing Timing: Quarterly <br /> 63. Implement construction Responsibility:Landfill operator Responsibility: County Public Works Department <br /> BMPs for creek Timing:During creek channel construction Timing: During creek channel construction <br /> Realignment <br /> Page 62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.