Laserfiche WebLink
r M r M M M m m r MM r = = M <br /> Forward Landfill 2018 Expansion Project—Mitigation Monitoring and Reporting Program Checklist <br /> Implementation <br /> Mitigation Measure Implementation Monitoring Confirmation <br /> Comments <br /> 64. Forward 2002(F.4) Responsibility:Landfill operator Responsibility:RWQCB <br /> Continue monitoring Timing: As required by RWQCB Timing.As determined by RWQCB <br /> of leachate controls <br /> 65. Forward 2002(F.7) <br /> Superseded by measures 60-62, above <br /> 66. Forward 2002(F.9) <br /> Replace groundwater Responsibility:Landfill operator Responsibility:RWQCB <br /> monitoring wells Timing: As required by RWQCB Timing:As determined by RWQCB <br /> 67. Austin 1994(K3.c),Austin 2000(K3.c) <br /> Timing of discharge of Responsibility:Landfill operator Responsibility:RWQCB <br /> detention pond Timing: Ongoing Timing:Annually <br /> 68. Austin 1994(K5.e),Austin 2000(K5.e) <br /> Salvage metallic discards Responsibility:Landfill operator Responsibility:San Joaquin County <br /> (AB 1760) Timing: Prior to approval of Environmental Health Department <br /> Solid Waste Facilities Permit(SWFP) Timing: Prior to Approval of <br /> Solid Waste Facilities Permit(SWFP) <br /> 69. Forward 1993(C3) <br /> Secondary containment Responsibility:Landfill operator Responsibility:San Joaquin County <br /> for diesel fuel Timing: Secondary containment shall be Environmental Health Department <br /> shown on Improvement Plan Timing: During monthly site visits <br /> G.SOILS AND GEOLOGY <br /> 70. Forward 2013(G.2) <br /> Seismic design Responsibility:Landfill operator Responsibility: RWQCB and CIWMB <br /> requirements of Timing:Letters from RWQCB and CIWMB Timing:Prior to issuance of <br /> Title 27 approving seismic design shall be Waste Discharge Requirements(WDRs) <br /> included with the Improvement Plan and Solid Waste Facilities Permit(SWFP) <br /> 71.Forward 2013 (G.3) <br /> Implement erosion Responsibility: Landfill operator Responsibility: RWQCB <br /> management plan Timing: Daily Timing: Annually <br /> Revegetate completed Responsibility:Landfill operator Responsibility: RWQCB <br /> cells Timing: Upon completion of each cell Timing:Annually <br /> Page 63 <br />