Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page II-28 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> F. 5: The re-routing of Proposed as Part of the Project: Less than <br /> the South Branch of The following measures are proposed as part of the project, as described in the Significant <br /> South Littlejohns Creek Project Description and design study for the proposed creek realignment: <br /> could result in flooding if <br /> the new alignment is not • The channel must function as a natural corridor,require little or no maintenance <br /> designed to accommo- once the vegetation is established, and should provide 100-year flood protection. <br /> date peak flows. <br /> • The channel slope and depth will be appropriate to the 100-year flood <br /> protection. The channel slope and depth are based on the invert elevations of the <br /> existing channel at the start and end of the new channel. The slope between <br /> these two points along this alignment is designed for 0.00055 ft/ft which <br /> translates into a ground surface profile along the alignment a channel depth <br /> between 10 and 12 feet. <br /> • The appropriate responsible agencies must review and approve the updated <br /> April 2018 design for the relocation of the South Branch of South Littlejohns <br /> Creek. <br /> Implementation of these procedures would reduce the impact to a less-than- <br /> significant level. <br /> F.6. Adding significant Proposed as Part of the Project. Less than <br /> new landfill volume Significant <br /> could potentially Forward Landfill has agreed to a short-term and long-term mitigation of the <br /> contribute to the known offsite impacts of the existing VOC plume,to provide an alternative source of <br /> VOC-contaminated drinking water to those residents in the downgradient area who are using <br /> domestic water wells for drinking water and whose domestic wells may be <br /> plume and other <br /> adversely affected by the VOC plume. A long-term solution currently being <br /> groundwater <br /> contamination. investigated by Forward to assist those residents on Newcastle Road,who are <br /> already being provided with bottled drinking water by Forward, is for Forward <br /> to provide the property owners on Newcastle Road in the footprint of the <br /> downgradient plume with municipal piped water to replace the current use of <br /> the supply wells; <br />