Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page II-29 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> • The residences on Newcastle Road would continue to be supplied with bottled <br /> water until municipal piped water is provided; <br /> • Residents on Austin Road would continue to be supplied with bottled water <br /> from the City of Stockton until municipal piped water is provided. <br /> • Because of the potential for impact from the plume to the downgradient <br /> receptors determination of the sampling program frequency and any changes to <br /> it, along with the appropriate mitigation,is the responsibility of the RWQCB and <br /> must be carried out under their permit authorization; and <br /> • The groundwater capture and remediation system could be augmented to <br /> capture the current offsite plume to the satisfaction of the RWQCB based on <br /> their review of future source control reports. <br /> Implementation of these procedures and protections would reduce the impact to a <br /> less-than-significant level. <br /> F.7. Potential decreases Proposed as Part of the Project: Less than <br /> in groundwater Significant <br /> resources due r loss of Continued recharge of extracted and treated groundwater. In the GeoLogic 2017 <br /> recharge surface area. Corrective Action Monitoring Workplan the construction of a storage basin for <br /> treatment system effluent that would subsequently infiltrate and recharge the <br /> groundwater is proposed. Although the recharge program does not specifically <br /> address the loss of infiltration within the expansion area it is designed to <br /> generally meet the intent of the water district to minimize overdrafting. <br /> The impact from the loss of direct infiltration over the expansion area is considered <br /> to be less than significant. <br /> F.8. Increased Mitigation Measure F.8: Implement the proposed Questa Engineering design Less than <br /> sedimentation during the specifications and standard construction BMPs during the construction phase of the Significant <br /> construction phase of the South Branch of Sough Littlejohns Creek realignment. Construction of the realigned <br /> relocation of the South <br />