Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page II-31 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> storage, and support <br /> facilities. <br /> G.3. Increased erosion Proposed as Part of the Project. Less than <br /> and sedimentation could • The applicant's Joint Technical Document(2018)references an erosion- Significant <br /> occur, particularly <br /> during the construction control plan that delineates various actions to minimize erosion and <br /> phases of the landfill, sedimentation, including maintaining the effectiveness of the surface <br /> due to grading and drainage control structures by keeping drainage ditches clear of debris and <br /> borrow soil excavation excessive vegetation and by making repairs, as necessary,to correct the <br /> and transport operations. effects of physical damage,erosion, settlement, or other events detrimental to <br /> effective operation of the drainage control system, and appropriate <br /> construction,landscaping, and maintenance of graded slopes and subsurface <br /> drainage systems. As part of that plan, grading operations would be <br /> scheduled to avoid the rainy season and be implemented by interim <br /> engineering control measures. Before grading is stopped, slopes would be <br /> directed to carry runoff to areas where erosion and sedimentation can be <br /> controlled. Truck beds would be hosed down to reduce soil spillage on <br /> paved roads and wind-blown dust. Relocation of Littlejohns Creek could <br /> lessen the sedimentation potential to the creek. <br /> • Completed cells will be stabilized by the planting and maintenance of <br /> drought-resistant grasses. This will inhibit wind and water erosion and <br /> maximize the fertility of the soil in order to facilitate revegetation. <br /> • Temporary plantings, geofabric drapes, and erosion-preventing diversions of <br /> surface water will be constructed as appropriate on temporary slopes. <br /> • Regular operational and post-closure monitoring of erosion control <br /> structures and plantings will be done for a minimum of five years. <br />