My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011836
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
PA-1800090
>
SU0011836
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 10:35:38 AM
Creation date
9/4/2019 10:04:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011836
PE
2656
FACILITY_NAME
PA-1800090
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
20106003, -05, 18115007, -16
ENTERED_DATE
6/26/2018 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
RECEIVED_DATE
8/15/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\APPL.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\EHD COND.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\DRAFT SEIR-09-2018.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\EIR-07-2018.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft Supplemental Environmental Impact Report Page II-30 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> Branch of South creek channel shall be implemented during the dry season. <br /> Littlejohns Creek. This would reduce potential impact of sedimentation from the proposed creek <br /> alignment to a less-than-significant level. <br /> G. SOILS AND <br /> GEOLOGY <br /> G.1. Seismic shaking Proposed as Part of the Project. Less than <br /> could impair or Significant <br /> otherwise compromise <br /> • The project sponsor has prepared a seismicity study for the site,with details <br /> both the existing and in Appendix D of the Geotechnical Investigation Report (Geo-Logic,2008a, <br /> proposed (for the new 2008b)and the Geosyntec (1999)report. If the potential maximum peak <br /> expansion areas)Class II ground acceleration in the seismicity study is greater than that assumed in <br /> liner and associated the preliminary design,the final project design analysis will make <br /> leachate collection modifications needed to meet the factor of safety (determinations may be <br /> system integrity, causing subject to the approval of the CalRecycle and/or RWQCB). Impacts to the <br /> slope instability, damage new liner and drainage system installed will be monitored as appropriate <br /> to drainage features, or based on any stipulations of the CalRecycle and/or RWQCB. <br /> differential settlement of <br /> the landfill over the life <br /> of the project, or <br /> following closure. <br /> G.2. Slope instability Proposed as Part of the Project: Less than <br /> caused by an earthquake Significant <br /> could result in damage to ' Overall reduction—or,in some cases,elimination or improvement—of <br /> existing and proposed slope instability at the project site can be achieved through the <br /> landfill administrative implementation of the seismic design measures designed to meet CCR Title <br /> facilities, scale house, <br /> 27. <br /> groundwater treatment <br /> system, composting <br />
The URL can be used to link to this page
Your browser does not support the video tag.