Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page II-40 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> (i.e., normally approximately February 1 -June 30)for the period <br /> encompassing nest building and continuing until fledglings leave nests. <br /> • This setback applies whenever construction or other ground disturbing <br /> activities must begin during the nesting season in the presence of nests that <br /> are known to be occupied. <br /> • Setbacks shall be marked by brightly colored temporary fencing. <br /> White-tailed Kite <br /> The following Incidental Take Minimization Measures, as outlined in the SJMSCP, <br /> shall be followed: <br /> • Prior to the initiation of tree removals/pruning, ground clearing, grubbing, <br /> grading or excavation activities scheduled to occur during the nesting season <br /> (i.e., normally approximately February 15—September 15), a preconstruction <br /> survey shall be performed by a qualified biologist. <br /> • A setback of 100 feet from nesting areas shall be established and maintained <br /> during the nesting season for the period encompassing nest building and <br /> continuing until fledglings leave nests. <br /> • This setback applies whenever construction or other ground-disturbing <br /> activities must begin during the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be marked by brightly colored <br /> temporary fencing. <br /> Burrowing Owl <br /> Consistent with the measures outlined in the SJMSCP and CDFG 2012,the following <br /> impact minimization measures shall be followed- <br /> • Consistent with the protocols outlined by the CDFG (2012 Appendix D), a <br /> "Take Avoidance Survey" shall be performed by a qualified biologist (as <br />