My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011836
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
PA-1800090
>
SU0011836
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 10:35:38 AM
Creation date
9/4/2019 10:04:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011836
PE
2656
FACILITY_NAME
PA-1800090
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
20106003, -05, 18115007, -16
ENTERED_DATE
6/26/2018 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
RECEIVED_DATE
8/15/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\APPL.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\EHD COND.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\DRAFT SEIR-09-2018.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\EIR-07-2018.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft Supplemental Environmental Impact Report Page II-41 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> defined in CDFG 2012,page 5)no less than 14 days prior to the initiation of <br /> ground disturbance. A final survey shall be conducted 24 hours prior to <br /> ground disturbance. <br /> • Ongoing rodent control measures at the landfill facility shall conform to the <br /> guidelines outlined in the SJMSCP (Appendix A) (see Impact H.10,below). <br /> • The Project Proponent may plant new vegetation or retain existing <br /> vegetation entirely covering the site at a height of approximately 36" above <br /> the ground. Vegetation should be retained until construction begins; tall <br /> vegetation will discourage colonization of the site by burrowing owl. <br /> • Alternatively,if burrowing owls are not known or suspected on a project site <br /> and the area is an unlikely occupation site for red-legged frog, San Joaquin <br /> kit fox or tiger salamander,the Project Proponent may disc or plow the entire <br /> project site to temporarily close ground squirrel burrows and render the <br /> construction site temporarily unusable by burrowing owls. <br /> • During the breeding season(February 1 through August 31), occupied <br /> burrows shall not be disturbed in accordance with the following restrictions <br /> (CDFG 2012): <br /> o Between 1 April and 15 August,minimum setbacks from occupied <br /> burrows shall be 200 m(656 ft)for low disturbance levels, and 500 m <br /> (1640 ft)for medium and high disturbance levels. <br /> o Between 16 August and 15 October,minimum setbacks from <br /> occupied burrows shall be 200 m (656 ft)for low and medium <br /> disturbance levels, and 500 m(1640 ft)for high disturbance levels. <br /> o Between 16 October and 31 March,minimum setbacks from occupied <br /> burrows shall be 50 m(164 ft)for low disturbance levels, 100 m (328 <br /> ft)for medium disturbance levels and 500 m (1640 ft)for high <br />
The URL can be used to link to this page
Your browser does not support the video tag.