Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page II-54 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> • The main highway leading to the site will be routinely inspected for litter. If <br /> the highway has litter associated with the trucks entering the facility,then <br /> the litter will be picked up on a routine basis. All necessary safety <br /> precautions will be followed. <br /> • Before and after photos of any litter removal effort may be taken in the event <br /> anyone questions the level of effort spent on litter collection. <br /> • Site management's cell phone numbers along with the office number may be <br /> provided to community/neighbors. <br /> K.7. Excavation,moving, Less than <br /> and depositing soil for Identified in This EIR: Significant <br /> daily cover of the Implement the fugitive dust control procedures and mitigation measures identified <br /> additional waste in Mitigation D.1. <br /> disposed under the <br /> proposed project could <br /> create visible dust and <br /> haze in the vicinity of the <br /> project. <br />