Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page II-55 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> D. ALTERNATIVES <br /> Alternatives in the 2013 EIR included a summary of the project objectives and described <br /> and evaluated the potential impacts of a full range of alternatives to the previously <br /> proposed project. That chapter also described alternatives considered but not studied <br /> further. Alternatives considered in the 2013 EIR included: <br /> • Alternative 1: No Project Alternative <br /> • Alternative 2A: Reduced Project Alternative <br /> • Alternative 2B: Reduced-Size/Reduced Daily Operations Alternative <br /> • Alternative 3: Expansion of North County Recycling Center and Sanitary Landfill <br /> The currently proposed Expansion Project is another alternative to the project evaluated <br /> in the 2013 EIR. As described in this SEIR, the 2018 Expansion Project would have <br /> reduced impacts compared with all of the previously considered alternatives other than <br /> the no-project alternative. <br /> However, alternatives to the implementation of the 2018 Expansion Project are available. <br /> These involve implementing only one of the two fill sites proposed under the Expansion <br /> Project and/or not increasing the daily truck trips beyond current levels. The impacts of <br /> these three alternatives are compared with the currently proposed project below. <br /> Alternative 4: Northern Fill Area Only <br /> Under this Alternative,the Northern fill area would be filled with about 3.3 million <br /> cubic yards of wastes, about 41% of that proposed under the 2018 Expansion Project. <br /> Impacts of this alternative would be similar to those of the proposed project except for <br /> the following: <br /> • No creek-relocation-related biological or water quality impacts would occur, <br /> however long-term ecological benefits of creek relocation would not be realized. <br /> • Noise, air quality, traffic, and odors impacts would be reduced by three years, <br /> from 2036 to 2033. <br /> • Health risk impacts associated with the expansion would be slightly reduced. <br /> • There would be no visual impacts associated with the Southern fill area. <br /> Alternative 5: Southern Fill Area Only <br /> Under this Alternative,the Southern fill area would be filled with about 4.8 million cubic <br /> yards of wastes, about 59% of that proposed under the 2018 Expansion Project. Impacts <br /> of this alternative would be similar to those of the expansion project except for the <br /> following: <br /> • Noise, air quality, traffic, and odors impacts would be reduced by two years, <br /> from 2036 to 2034. <br /> • Health risk impacts associated with the expansion would be slightly reduced. <br />