Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page IV.A-19 <br /> Forward Inc.Landfill 2018 Expansion Project <br /> As discussed under"San Joaquin County Zone Classification', above, the proposed project <br /> would be consistent with the site's AG-40 zoning. The proposed relocation of the South Fork of <br /> South Littlejohns Creek would relocate, without substantially altering,the open space and <br /> riparian habitat values of the existing alignment of the South Fork. In addition,by purchasing <br /> off-site mitigation,the project would enhance open space and riparian habitat at the mitigation <br /> site, as discussed in Section F. Biological Resources. For these reasons, the proposed project <br /> would not conflict with goals,policies, and implementation measures of the General Plan. <br /> General Plan Solid Waste Disposal Policies <br /> The proposed project would not conflict with Implementation Program IS-J of the San Joaquin <br /> County General Plan, which calls for mandatory waste collection and recycling. <br /> General Plan Agricultural Land Policies <br /> The proposed project's consistency with agricultural land policies is discussed in Impact A.2, <br /> below. <br /> General Plan Fire Safety and Law Enforcement Policies <br /> The proposed project would not conflict with the Fire Safety goal and policies of the General <br /> Plan Public Health and Safety Element, including Policy PHS-4.1,which calls for a Community <br /> Wildfire Protection Plan, and Policy PHS-4.6, which advocates coordination among fire <br /> prevention agencies. <br /> As discussed in I. Public Services and Utilities, Setting, Fire Protection and Emergency Medical <br /> Services, and Impacts I.1,I.2, and I.3, the proposed project would be located within 4.0 miles of <br /> a fire station(Policy 4)and,incorporating mitigation measures identified in this SEIR,would <br /> provide adequate access and water supply (Policies 2 and 5). <br /> General Plan Hazardous Materials and Wastes Policies <br /> As discussed in E. Public Health and Safety,the proposed project,including mitigation <br /> measures identified in this SEIR, would not conflict with the Hazardous Materials and Wastes <br /> goal and policies of the General Plan Public Health and Safety Element,including Policy PHS- <br /> 7.2,which calls for avoidance of environmental contamination from hazardous materials; Policy <br /> PHS-7.3,which calls for appropriate use, storage, and disposal of hazardous materials;Policy <br /> PHS-7.5,which calls for safe location of hazardous material use, storage, and disposal:; and <br /> Policy PHS-7.9,which requires public disclosure of hazardous materials and wastes. <br /> As discussed in E. Public Health and Safety and G. Hydrology and Water Quality,the proposed <br /> project would include mitigation measures to address air, water, and soil contamination issues <br /> (Policy 7.2), and would be located away from population centers (Policy 7.5). The project would <br /> comply with hazardous waste laws and regulations (Policies 7.3 and 7.9). <br />