Draft Supplemental Environmental Impact Report Page IV.A-20 <br /> Forward Inc.Landfill 2018 Expansion Project <br /> Countywide Integrated Waste Management Plan <br /> Public Resource Code Section 50001 requires that the County make a finding that the proposed <br /> facility is identified in the most recent Countywide Integrated Waste Management Plan. The <br /> former Austin Road and original Forward Landfills at the project site are currently identified as <br /> disposal facilities in the Siting Element of the Countywide Integrated Waste Management Plan <br /> (CIWMP). <br /> As discussed in Setting, above,the County has disposal capacity estimated to last until <br /> approximately 2041. The Proposed Project would add approximately 8.12 million cubic yards <br /> to countywide disposal capacity, and the former Austin Road and original Forward Landfills at <br /> the project site are currently identified as disposal facilities in the Siting Element of the CIWMP. <br /> The Project would increase the capacity of the existing facilities identified in the Siting Element. <br /> While expanding the estimated remaining life of the landfill in the Siting Element would not be <br /> a substantial change, it would require formal approval by the Integrated Waste Management <br /> Plan Task Force and the County Board of Supervisors. As of August 2018,the Siting Element <br /> had not been revised to account for the additional capacity of the proposed project. If the <br /> proposed landfill infill project is approved, the Siting Element would be amended to ensure <br /> consistency with Public Resources Code Section 50001. <br /> Multi-Species Conservation and Open Space Plan <br /> As discussed in Setting, above, the San Joaquin Multi-Species Conservation and Open Space Plan <br /> (SJMSCP)is a voluntary program. The project sponsor will participate in the SJMSCP. The <br /> proposed project would be consistent with the SJMSCP as amended. Mitigation measures to <br /> reduce impacts to species of concern,in addition to participation in the SJMSCP, are discussed <br /> in F. Vegetation and Wildlife, Impacts and Mitigation Measures. <br /> Airport Land Use Plan Consistency and General Plan Aviation Policies <br /> As discussed under the Airport Land Use Commission(ALUC)and 2016 Airport Land Use <br /> Compatibility Plan Update for Stockton Metropolitan Airport(ALUP)section, above, the 2018 <br /> Expansion Project is located within the Airport Influence Area of the Stockton Metropolitan <br /> Airport (SMA), which is divided into various land use zones, as shown in Figure IV.A-2. <br /> Different land use standards, conditions, and restrictions apply in each subarea. As discussed <br /> in more detail in Airport Land Use Commission (ALUC)and 2016 Airport Land Use <br /> Compatibility Plan Update for Stockton Metropolitan Airport(ALUP), above, the 2018 <br /> Expansion Project is within the Traffic Pattern(Zone 7b). <br /> The 2016 Airport Land Use Compatibility Plan Update for Stockton Metropolitan Airport, <br /> "Hazards to flight" includes prohibited land uses in Traffic Pattern (Zone 7b)applicable to the <br /> two proposed expansion areas, which include "physical (e.g., tall objects), visual, and electronic <br /> forms of interference with the safety of aircraft operations. Land use development that may cause the <br /> attraction of birds or other wildlife hazards to increase is also prohibited. Such uses (e.g. stormwater <br /> management facilities, other waterways,golf courses)are further detailed in FAA Advisory Circular <br />