Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page IV.F-32 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> Mitigation Measure F.4. Participation in the SJMSCP affords the project proponent Incidental <br /> Take authorization for western pond turtle pursuant to ESA, CESA and CEQA. Nonetheless, to <br /> minimize the potential for incidental take of the species,preconstruction surveys for western <br /> pond turtles shall be conducted within the project study area by a qualified biologist approved <br /> by the SJMSCP TAC. If the species is detected,within the study area, the project shall <br /> undertake Incidental Take Avoidance and Minimization Measures to protect the species as <br /> directed by the TAC. Avoidance and minimization measures may include the following, as <br /> specified by the TAC: <br /> 1) When nesting areas for pond turtles are identified on a project site, a buffer area of 300 <br /> feet shall be established between the nesting site (which may be immediately adjacent to <br /> wetlands or extend up to 400 feet away from wetland areas in uplands)and the wetland <br /> located near the nesting site. These buffers shall be indicated by temporary fencing if <br /> construction has begun or will begin before nesting periods end (the period from egg <br /> laying to emergence of hatchlings is normally April to November). The buffer zones <br /> shall be maintained until the nesting season has ended. <br /> These mitigation measures would reduce potential impacts to Pacific pond turtle to less than <br /> significant levels because impacts to pond turtles would be avoided or minimized. In addition, <br /> restoration of the realigned creek channel would provide at least equivalent habitat for western <br /> pond turtle. <br /> Impact F.S. Potential"Take"of Special-status Bird Species. Construction could adversely <br /> affect special-status birds including Swainson's hawk, golden eagle,tricolored blackbird, white- <br /> tailed kite,burrowing owl,loggerhead shrike, northern harrier, and California horned lark <br /> through direct and indirect impacts. To ameliorate the potential effects of project operations on <br /> air traffic safety,the services of a falconer are used to prevent the seasonal aggregation of gulls <br /> over the project site,which has potential to affect foraging or breeding behavior of special-status <br /> bird species. These impacts are potentially significant. <br /> Mitigation Measure F.5a. Participation in the SJMSCP affords the project proponent Incidental <br /> Take authorization for these species,both for direct impacts and loss of habitat. As specified in <br /> the SJMSCP, incidental take avoidance measures have been developed and must be <br /> implemented to conform to the SJMSCP;each species is discussed separately,below_ <br /> All SJMSCP Covered Bird Species are subject to the MBTA. The SJMSCP is based on the more <br /> stringent,federal standard for "take"pursuant to the FESA,which includes modification of <br /> habitat. Incidental Take Permits for SJMSCP-covered bird species are included in the SJMSCP, <br /> to allow for the conversion of habitat with appropriate creation of compensatory habitat for <br /> these species (SJCOG 2000). However, to conform to the MBTA, the Incidental Take <br /> Minimization Measures of the SJMSCP may not result in a "take", as defined by the MBTA, of <br /> SJMSCP Covered Bird Species. The Incidental Take Minimization Measures in Section 5.2.4 of <br /> the SJMSCP have been designed to avoid such a "take". <br /> Swainson's Hawk <br />