My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011836
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
PA-1800090
>
SU0011836
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 10:35:38 AM
Creation date
9/4/2019 10:04:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011836
PE
2656
FACILITY_NAME
PA-1800090
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
20106003, -05, 18115007, -16
ENTERED_DATE
6/26/2018 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
RECEIVED_DATE
8/15/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\APPL.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\EHD COND.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\DRAFT SEIR-09-2018.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\EIR-07-2018.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft Supplemental Environmental Impact Report Page IV.F-33 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> Swainson's hawks have been observed in the project vicinity and there is a known nest site in <br /> an oak tree on Austin Road, approximately 200 feet from the landfill boundary. Potentially <br /> suitable nest sites are also present near to the project site,particularly along the North Branch of <br /> the South Fork of Littlejohn s Creek. The proposed project does not include the removal of any <br /> potential nest trees,but construction activities would occur in proximity to a known nest site <br /> and potential nest trees. Given the use of the site as a landfill and associated truck traffic and <br /> landfill operation activities,baseline noise conditions are high on the site. Initial construction <br /> activities (e.g., soil excavation)could temporarily elevate onsite noise levels, thus potentially <br /> affecting an active Swainson's hawk nest(should one occur within 500 feet of the construction <br /> zone). Participation in the SJMSCP affords the project proponent Incidental Take authorization <br /> for Swainson's hawk pursuant to ESA, CESA and CEQA. To conform to the SJMSCP in regards <br /> to protecting potentially occurring nearby active nests, the following measures shall be <br /> followed: <br /> • Prior to the initiation of ground clearing, grubbing, grading or excavation activities, <br /> scheduled to occur during the breeding season (February 16 through August 31), a <br /> preconstruction survey for Swainson's hawk nests shall be performed by a qualified <br /> biologist. <br /> • If an occupied Swainson's hawk nest is detected, a setback of 500 feet from the nesting <br /> area shall be established and maintained during the nesting season for the period <br /> encompassing nest building and continuing until fledglings leave nests. The setback <br /> distance may be smaller, subject to CDFW approval. Setbacks shall be marked by <br /> brightly colored temporary fencing. <br /> • If a nest tree becomes occupied during construction activities,then all construction <br /> activities shall remain a distance of two times the dripline of the tree,measured from the <br /> nest. <br /> These Incidental Take Minimization Measures are consistent with the provisions of the MBTA. <br /> Golden Eagle <br /> Although no suitable nesting sites for golden eagle are present onsite,potential nesting habitat <br /> occurs on adjacent properties. Participation in the SJMSCP affords the project proponent <br /> Incidental Take authorization for golden eagle pursuant to ESA, CESA and CEQA. As outlined <br /> in the SJMSCP59, when a site inspection indicates the presence of a nesting golden eagle, the <br /> following measures shall be followed: <br /> • Prior to the initiation of ground clearing, grubbing, grading or excavation activities, a <br /> scheduled to occur during the nesting season (i.e.,normally approximately February 1 - <br /> June 30), a preconstruction survey shall be performed by a qualified biologist. <br /> • If an occupied golden eagle nest is detected, a setback of 500 feet from the nesting area <br /> shall be established and maintained during the nesting season(i.e., normally <br /> approximately February 1 -June 30)for the period encompassing nest building and <br /> continuing until fledglings leave nests. <br /> s9 SJMSCP Chapter 5.2.4.21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.