Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page IV.F-34 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> • This setback applies whenever construction or other ground disturbing activities must <br /> begin during the nesting season in the presence of nests that are known to be occupied. <br /> • Setbacks shall be marked by brightly colored temporary fencing. <br /> These Incidental Take Minimization Measures are consistent with the provisions of the MBTA <br /> as described and are consistent with the provisions of the BGEPA. <br /> White-tailed Kite <br /> White-tailed kite has been observed foraging in the project area and suitable nesting habitat is <br /> present in the immediate project vicinity. Participation in the SJMSCP affords the project <br /> proponent Incidental Take authorization for white-tailed kite in the form of habitat conversion <br /> provided the following Incidental Take Minimization Measures,-as outlined in the SJMSCP60, <br /> are followed: <br /> • Prior to the initiation of tree removals/pruning, ground clearing, grubbing, grading or <br /> excavation activities scheduled to occur during the nesting season(i.e., normally <br /> approximately February 15—September 15), a preconstruction survey shall be <br /> performed by a qualified biologist. <br /> • A setback of 100 feet from nesting areas shall be established and maintained during the <br /> nesting season for the period encompassing nest building and continuing until <br /> fledglings leave nests. <br /> • This setback applies whenever construction or other ground-disturbing activities must <br /> begin during the nesting season in the presence of nests that are known to be occupied. <br /> Setbacks shall be marked by brightly colored temporary fencing. <br /> These Incidental Take Minimization Measures are consistent with the provisions of the MBTA. <br /> Burrowing Owl <br /> Although burrowing owls were not detected within the study area during biological surveys in <br /> 2005 and a follow up surveys in 2008,2012, 2014, and 2017, some suitable habitat could occur on <br /> the site and in the project vicinity and the species could colonize the site in the future. <br /> Participation in the SJMSCP affords the project proponent Incidental Take authorization for <br /> burrowing owl pursuant to ESA, CESA and CEQA; this provides both for the taking of the <br /> species incidental to otherwise lawful activities as well as the conversion of suitable burrowing <br /> owl habitat to non-suitable habitat. Consistent with the measures outlined in the SJMSCP61 and <br /> CDFG 2012,the following impact minimization measures shall be followed: <br /> • Consistent with the protocols outlined by the CDFG (2012 Appendix D), a "Take <br /> Avoidance Survey" shall be performed by a qualified biologist(as defined in CDFG <br /> 2012,page 5)no less than 14 days prior to the initiation of ground disturbance. A final <br /> survey shall be conducted 24 hours prior to ground disturbance. <br /> 6o SJMSCP Chapter 5.2.4.19 <br /> 61 SJMSCP Chapter 5.2.4.15 <br />