Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page IV.G-18 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> • Channel design features are proposed as part of the expansion project: The project includes <br /> channel reconfiguration and localized flood protection berms to isolate the landfill surfaces <br /> from floodwaters. <br /> • The project design shall also include provision of replacement floodplain area and storage <br /> volume in an easement along the relocated South Branch of South Littlejohns Creek. <br /> • The channel and floodplain storage easement are designed to accommodate the 100-year, <br /> 24-hour storm. The design would also include a three-foot freeboard. <br /> All of these measures have been or will be incorporated into the design of the landfill expansion <br /> and the relocated South Branch channel. Therefore,potential surface water drainage impacts <br /> would be reduced to a less than significant level. <br /> Mitigation Measure G.1:None required. <br /> Impact G.2: If erosion from soil stockpiles and landfill surfaces are not properly controlled, <br /> or inadvertent spills of refuse or other substances onsite occurred,surface water could <br /> potentially become contaminated. <br /> If erosion from stockpiles and landfill refuse were not properly controlled,this could create <br /> sedimentation in Littlejohns Creek and cause contaminants in the refuse to migrate in the <br /> surface water and be deposited downstream. Wet Weather Plans and Erosion Control Plans <br /> have historically been in place at the Forward Landfill to protect against such uncontrolled <br /> erosion and sedimentation. No new regulatory issues have been identified with regard to <br /> management of this erosion potential. <br /> The following procedures are proposed as part of the proposed expansion project: <br /> • The current drainage control structures and monitoring would continue to be implemented <br /> to control erosion and sedimentation in the expansion areas. Proposed structural controls <br /> include the drainage control system and daily cover. Operational controls include <br /> maintenance of the drainage system by keeping ditches clear of debris and excessive <br /> vegetation, and making needed repairs to drainage structures. Corrective measures would <br /> be implemented if inspections show excessive erosion or damage to drainage channels. Any <br /> areas showing erosive effects would be mitigated by removing loose debris followed by <br /> replacement,regrading, and compacting the area.Monitoring and protection against <br /> sediment from entering the Littlejohn Creek channel would be implemented,including the <br /> diversion of part of Littlejohns Creek farther away from the landfilled area. <br /> • In order to minimize sediment transport to Littlejohns Creek,landfill slopes, ridgetops, and <br /> peripheral areas would be revegetated to inhibit erosion. <br /> Implementation of these procedures would reduce the impact to a less-than-significant level. <br /> Mitigation Measure G.2:None required. <br />