Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page IV.G-17 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> As described in the Project Description, State and Federal standards have been established for <br /> the siting, design, construction, operation, closure, and post-closure of Class II landfills. <br /> Similarly, the closed Class I landfill has post-closure monitoring and maintenance requirements. <br /> These standards incorporate state-of-the-art engineering requirements that are intended to <br /> reduce the risks associated with waste disposal facilities to an acceptable level. An inconsistency <br /> between the proposed project and regulations related to surface or groundwater hydrology and <br /> water quality also would have the potential to result in significant impacts. <br /> Impact G.1: If rainfall runoff was not properly controlled, surface water bodies could become <br /> contaminated through contact with the landfill refuse. <br /> If rainwater falling on the new landfill area contacts the landfill refuse and picks up dissolved <br /> contaminants and is not controlled by the drainage system,surface water could migrate to <br /> Littlejohns Creek and flow downsteam to the San Joaquin River. The applicant's report for the <br /> relocation of the South Branch of South Littlejohns Creek report (Questa Engineering 2017) <br /> recommends a project design feature that would control landfill and site drainage run-on and <br /> runoff, so that run-on and run-off would be controlled and channeled to onsite stormwater/ <br /> sedimentation ponds. <br /> The drainage study utilizes San Joaquin County local rainfall data, and the Rational Method <br /> was used to estimate maximum potential runoff from a 1,000-year,24-hour event. The 1,000- <br /> year,24-hour storm criteria is a RWQCB requirement for Class II landfills. The surface water <br /> control system and drainage control structures for the proposed project are sized to <br /> accommodate the calculated peak flows. The proposed surface water control system would also <br /> divert run-on from properties surrounding the landfill. <br /> The following surface water management procedures are proposed as part of the proposed <br /> expansion project: <br /> • The drainage study utilizes San Joaquin County local rainfall data, and the Rational Method <br /> would be used to estimate maximum potential runoff from a 1,000-year,24-hour storm <br /> event. The surface water control system and drainage control structures for the proposed <br /> project would be sized to accommodate the calculated peak flows. <br /> • As part of the design plans for the proposed landfill expansion,Forward will complete <br /> calculations of the 1000-year, 24-hour storm event peak discharges. The hydraulic and <br /> drainage study would be used to design appropriate drainage controls. Drainage controls <br /> would be designed to prevent contact between surface water and refuse. Site run-on and <br /> run-off control facilities consist of drains and perimeter ditches that channel surface water to <br /> holding and evaporation ponds on the site. The surface-water collection drain system would <br /> be designed to divert the water to the onsite sedimentation basins. All waste at the proposed <br /> Forward Landfill would be separated from the North and South Branches of South <br /> Littlejohns Creek by a levee system or other acceptable method designed to protect the site <br /> from a 100-year flood event. <br />