My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002168
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
UP-00-07
>
SU0002168
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:04 AM
Creation date
9/4/2019 10:04:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002168
PE
2626
FACILITY_NAME
UP-00-07
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
APN
18115007, 09, &
ENTERED_DATE
10/23/2001 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
RECEIVED_DATE
5/25/2000 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\UP-00-07\SU0002168\APPL.PDF \MIGRATIONS\A\AUSTIN\9999\UP-00-07\SU0002168\CDD OK.PDF \MIGRATIONS\A\AUSTIN\9999\UP-00-07\SU0002168\EH COND.PDF \MIGRATIONS\A\AUSTIN\9999\UP-00-07\SU0002168\2012 MONT RPT.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 4, 2012 <br /> of at least 1000-2000 scfm. A LFG flare has also been installed at the site. <br /> Additional LFG extraction wells were installed in 2011. <br /> b. 13 (DA) <br /> Proposed as Part of the Project: <br /> a. Water any excavation areas twice per day, <br /> b. Water stockpile haul roads at least once per day, <br /> c. Water the perimeter facility road once per day on any day that the road <br /> is used, <br /> d. Limit on-site travel speed to speeds less than those that would cause <br /> visible dust emissions behind the vehicle, <br /> e. Prevent track-out of mud and dirt through the following measures: <br /> 1) Providing a paved interior road of at least 100 feet in length <br /> to allow mud and dirt to drop off before exiting the site, <br /> 2) Removing dirt and mud from interior paved roads throughout <br /> the work-day, <br /> 3) Removing any dirt deposition on Austin Road at the end of each <br /> work-day. <br /> f. Apply all-weather surfacing to any unpaved road segment that carries 50 <br /> or more vehicle trips per day continuously for more than thirty (30) <br /> days, <br /> g. Water unpaved equipment parking areas at least daily, <br /> h. Best management practices shall be followed at all times during <br /> operation of the grinder/screener at the composting operation, and <br /> shall include assuring that inputs to the grinder/screener have a <br /> sufficient moisture content to prevent generation of visible dust or <br /> particulate matter. <br /> Current Status: Dust control measures are being implemented as discussed <br /> above and in accordance with the JTD. Forward also utilizes street cleaning <br /> equipment to clean paved roadways,including Austin Road,when necessary. <br /> c. 14 (D.5) <br /> Proposed as Part of the Project: <br /> Measures that reduce landfill traffic and operations impacts through the <br /> use of Best Available Control Methods (BACMs) as defined by the San <br /> Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) shall be <br /> required to reduce this cumulative impact. <br /> Current Status: For dust impacts, the SJVUAPCD Rule 8040 (Fugitive Dust <br /> Requirements for Control of Fine Particulate Matter (PM-10) from Landfill <br /> Disposal Sites) requires removal of mud and dirt from public paved roads, <br /> including shoulders, adjacent to the landfill site at the end of the work day or <br /> a minimum of once every 24-hours of occurrence. It also requires that <br /> Page 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.