Laserfiche WebLink
April 4, 2012 <br /> Current Status: Dense screening vegetation consisting of oak trees, oleander, <br /> and onsite berms exist along Austin Road in the area of the original Forward <br /> Landfill. Current landfill operations are being performed several hundred <br /> feet west of Austin Road. This area is a sufficient distance away from Austin <br /> Road to shield residents and motorists along Austin Road from views of <br /> landfill operations. Night lighting will be oriented to face away from <br /> residents and motorists <br /> (18) 85 Austin 1994 (M.d), Austin 2000(M.d) <br /> At any time in the development of the expanded landfill when additional <br /> lighting is proposed, preliminary lighting designs should be sent to the <br /> Northern California Women's Facility for review and comments. <br /> Current Status: Forward is not currently planning on installing additional <br /> lighting. Forward will send preliminary lighting designs to the Northern <br /> California Women's Facility for review and comments if and when <br /> additional lighting is planned. In addition, the California Women's Facility <br /> is currently closed. <br /> (19) 86 (K.5) <br /> Proposed as Part of the Project: <br /> Whenever possible, the working face will be oriented to the downwind side <br /> of prevailing winds to help reduce litter. <br /> Current Status: Whenever possible, the working face will be oriented to the <br /> downwind side of prevailing winds to help reduce litter. <br /> 2. PUBLIC WORKS (Staff Contact: Adam Brucker, 209-468-3000) <br /> a. 3 (B.1) <br /> Proposed as Part of the Project: <br /> The County has determined that the applicant shall contribute their fair <br /> share of the signal installation at the intersection of Austin Road/Mariposa <br /> Road. A previous study (Austin Road Landfill EIR, 1999) identifies a <br /> mitigation measure that included the applicant's contribution to the <br /> installation of a traffic signal at Austin Road/Mariposa Road. This is <br /> included in existing permit requirements and is assumed to occur as part <br /> of baseline conditions. <br /> Current Status: Forward has paid the traffic mitigation fee. <br /> b. 4 (B.2) <br /> Identified in EIR: <br /> Page 9 <br />