Laserfiche WebLink
ensure the coinpletion of improvements within one year after filing the Parcel Map. <br /> (Planning Title Section 9-9133) <br /> I Street lighting shall be provided for the frontage of "B' Street and Mackville Road. <br /> (Planning Title Section 9-9301) <br /> k. The property shall annex to County Service Area No. 43 prior to approval of the Parcel <br /> Map to provide for the operation, maintenance, and improvement of storm drainage, <br /> water, and street lighting facilities. (Planning Tale Section 9-10003) <br /> 1. A Preliminary Soils Report isvu `fodin accordance r the design of the roadswith �unty standards for the <br /> (Planning True Section <br /> purpose of determining the Rale <br /> 9-9104) <br /> M All utilities shall be underground except power transmission facilities of 35 KV or greater. <br /> Public utility easements shall be provided along the road frontage of the subdivision and <br /> as required by the public utility companies. (Piannin Tal 5e <br /> n. All traffic signs and markings shall conform to the Manual on Uniform Traffic Control <br /> Devices and San Joaquin County standards, and they shall be showri on the improve- <br /> ment plans. (Planning Title Section 9-93390) <br /> o. Water meters shall be installed ptior to all water services. (Board of Supervisors Order <br /> B-91-650) <br /> P. An offer of do iication of groundwater rights is required. <br /> 2, PUBLIC HEALTH SEI VICES: <br /> a. The sewage disposal systems shall comply with the rules and regulations of San Joaquin <br /> County Ordinance No. 549 prior to parcel map approval. A percolation test and a sewage <br /> disposal area as determined by the percolation test are required for Environmental Health <br /> Division approval. A permit for the percolation test from the Environmental Health Division <br /> is required. <br /> b. Construct an individual sewage disposal system on each parcel under a permit and <br /> inspection by the Environmental Health Division at the time of Development. A dual <br /> system shall be required. <br /> C. Connection to an approved public water supply system is required. Prior to recordation <br /> ier <br /> be <br /> red which <br /> of the Pcal Map, a letter <br /> to serve rom the water the the de a opment an{d thatlthe system meets States that es�tanda ds. <br /> have thep a}I <br /> 3. BUILDING INSPECTIVN DIVISION: <br /> a Fire apparatus access roads shall be required for new development constructed when <br /> any portion of an exterior wall of the first story is located more than 150 feet from the <br /> public accessen d.of PuWorks <br /> rs road blic ll be constructed to meet or exceed(Section design <br /> of the Department 10.203 UFC). The access oa,�imust be fully <br /> improved to these standards prior to any final inspections. <br /> RESOLLITION R-92-739 ATTACHMENT <br /> PAGE 2 <br />