Laserfiche WebLink
k. AVIGATION EASEMENT: An avigation easement shall be recorded in favor of the Stockton <br /> Metropolitan Airport. (Development Title Section 1610.8[a]) <br /> I. BUILDING CODE REQUIREMENTS:The following California Building Code(CBC)and San Joaquin <br /> County Ordinance requirements will be applicable to the proposed project. The following conditions <br /> shall be addressed prior to submittal of a building permit application to the Building Inspection Division: <br /> (1) A building permit for each separate structure or building is required. Submit plans, Specifications <br /> and supporting calculations, prepared by a Registered Design Professional(architect or engineer) <br /> for each structure or building, showing compliance with The 2016 California Building, Existing <br /> Building, Mechanical, Plumbing, Electrical, Energy and Fire codes as may be applicable. Plans for <br /> the different buildings or structures may be combined into a single set of construction documents. <br /> (2) The required plans must be complete at the time of submittal for a building permit. Plans must <br /> address building design and construction, fire and life safety requirements, accessibility and show <br /> compliance with the current California codes and San Joaquin County ordinances.A complete set <br /> of plans must include fire sprinkler plans, truss design submittals, metal building shop drawings, <br /> structural plans and calculations,plumbing,electrical and mechanical drawings and energy report. <br /> (3) A soils report is required-pursuant to CBC § 1803 for foundations and CBC appendix § J104 for <br /> grading. All recommendations of the Soils Report shall be incorporated into the construction <br /> drawings. <br /> (4) For each proposed new building, provide the following information on the plans: <br /> A. Description of proposed use <br /> B. Existing and proposed occupancy Groups <br /> C. Type of construction <br /> D. Sprinklers(Yes or No) <br /> E. Number of stories <br /> F. Building height <br /> G. Allowable floor area <br /> H. Proposed floor area <br /> I. Occupant load based on the CBC <br /> J. Occupant load based on the CPC <br /> (5) The phase two conversion of the existing single family residence into an administration building <br /> will constitute a change of occupancy. A change of occupancy will require a code analysis report <br /> and necessary plans prepared by an architect or engineer in accordance with the California <br /> Existing Building Code. The report and plans shall identify existing conditions, propose alterations <br /> necessary to bring the building in compliance with the current code and include the following: <br /> A. Description of proposed use <br /> B. Existing and proposed occupancy Groups <br /> C. Type of construction <br /> D. Sprinklers(Yes or No) <br /> E. Number of stories <br /> F. Building height <br /> G. Allowable floor area <br /> H. Proposed floor area <br /> I. Occupant load based on the CBC <br /> J. Occupant load based on the CPC <br /> (6) Modifications to existing buildings are required to include upgrades related to disability access <br /> pursuant to the California Existing Building Code. Plans showing these upgrades must be <br /> prepared by a registered engineer or licensed architect and shall be submitted for review and <br /> PA-1800106 Conditions of Approval <br />