Laserfiche WebLink
(6) CFC, Section 5001.3.3.1 Properties of Hazardous Materials — A complete list of hazardous <br /> materials used and or stored at this site shall be provided. <br /> (7) A complete review, at building permit submittal, will require compliance with applicable codes <br /> and ordinances. <br /> (8) CFC, Section 105 Permits: Operational permit(s) may be required prior to occupancy. <br /> 2. DEPARTMENT OF PUBLIC WORKS (Staff Contact: Alex Chetley, [209]468-3000) <br /> a. The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six(6)foot high chain link fence or <br /> equal when the maximum design depth is 18 inches or more. Required retention basin capacity <br /> shall be calculated and submitted along with a drainage plan for review and approval, prior to <br /> release of building permit. (Development Title Section 9-1135) <br /> b. The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and payable <br /> at the time of building permit application. The fee will be based onthecurrent schedule at the time <br /> of payment. The fee shall be automatically adjusted July T of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record. (Resolutions R-00-433) <br /> c. The Regional Transportation Impact Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application. The fee will be based on the current schedule at <br /> the time of payment. (Resolution R-06-38) <br /> d. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee <br /> is due and payable prior to issuance of the building permit. The fee will be based on the current <br /> schedule at the time of payment. (Development Title Section 9-818.4 and Resolutions R-91-327, <br /> R94-185 and R-97-5) <br /> e. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> f. This project falls within the definition of a Priority Project as defined in either the County "Storm <br /> Water Quality Control Criteria Plan"(SWQCCP)or the County Phase I National Pollutant Discharge <br /> Elimination System (NPDES) permit and shall comply with the following conditions: <br /> (1) A registered professional engineer shall design a system or combination of systems to treat, <br /> filter, or infiltrate the 85th percentile storm as defined in the County's 2009 SWQCCP. The <br /> system design shall follow standards as outlined in the 2009 SWQCCP or in the "California <br /> Association of Stormwater Quality Agencies" (CASQA) publications and comply with the <br /> conditions of the County Phase I NPDES permit. CASQA documents are available at <br /> htto://www.casga.org. Plans and/or calculations of the proposed system shall be submitted to <br /> the County for review and approval. <br /> (2) Applicant shall submit a"Storm Water Pollution Prevention Plan" (SWPPP)to Public Works for <br /> review. A SWPPP preparation guide is available at the Department of Public Works.A copy of <br /> the approved SWPPP and all required records, updates, test results and inspection reports <br /> shall be maintained on the construction site and be available for review upon request. The <br /> post construction chapter of the SWPPP must identify expected pollutants and how they will <br /> be prevented from entering the storm system. The chapter shall also contain a maintenance <br /> plan, a spill plan, and a training plan for all employees on proper use, handling and disposal of <br /> potential pollutants.The example plans are available in the SWQCCP and CASQA handbooks. <br /> (3) All Priority New Development and Significant Redevelopment Projects must meet the volume <br /> reduction requirement outline in the County's SWQCP 2009 available at <br /> hftp://sjcleanwater.org/LID.htm <br /> PA-1800106 Conditions of Approval <br />