Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> UP-01-7 <br /> Bacchetti <br /> Use Permit Application No.UP-01-7 was approved by the San Joaquin County Planning <br /> on January <br /> on July 5,2001. The effective date of approval is July 15, 2001• This app expire <br /> 14, 2003, which is 18 months from}ll necessary buildive date ing peprmitsl, unless have beenlseclured Conditions <br /> Approval have been complied with,{ <br /> in force,and (3}all necessary permits from other agencies have been secured and remain in force. <br /> otherwise specified,all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> Unlessand the issuance of any building permits. Those Conditions <br /> priorto the establishment of the use been identified as Ora Section Number have Ordinance requirements pertinent to this <br /> followed e <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply- <br /> 1. COMMUNITYDEVELOPMENTDEPARTMENT(StaffContactJenniferJolley,468- 3161) <br /> Ian required as a part of the <br /> Plan. <br /> The Site P q <br /> a. <br /> IMPROVEMENT PLAN: Submit an ImprovementThis Plan must <br /> building permit must be prepared by a registered civil engineer or licensed architect- <br /> show drainage, driveway access details (including gates), on-site parking, landscaping, signs, <br /> existing'and proposed osed utility services, and grading (refer to the "SITE PLAN CHECK LIST' for <br /> p <br /> details). A fee is required for the Site Plan review. (DevelopmentTitle Section 9-854) <br /> b. APPROVED USE: This approval is to convert a 2,844-square-foot building into a cheese <br /> manufacturing facility as shown on the Plan dated May 9,2001. <br /> c. BUSINESS LICENSE: The applicant shall secure an approved Business License prior to the <br /> initiation of the use. The Business License may be applied for concurrently with the building permit <br /> application. (Section 7-1000 of the County Ordinance Code) <br /> d. STORM DRAINAGE:Any additional storm water drainage created by new improvements shall be <br /> retained on the site. The drainage pattern and corresponding storm drain improvements shall be <br /> shown on the Site Plan. Drainage calculations prepared by a registered civil engineer or architect <br /> shall be included.(DevelopmentTitle Section 9-1135) <br /> e. PARKING: Off-street parking shall be provided and comply with the following: <br /> 1 All parking spaces, driveways, and maneuvering areas shall be surfaced and permanently <br /> O maintained with base material of appropriate depth and asphalt concrete or Portland cement <br /> concrete to provide a durable, dust-free surface. Bumper guards shall be provided where <br /> necessary to protect adjacent structures or properties. (DevelopmentTitle Section 9-1015.5[e]) <br /> (2) A minimum of six (6) additional parking spaces shall be provided, including one (1) van <br /> accessible space. Accessible 24).bl 2 spaces saces arleb required for everyted as eas l 000 feetpossible <br /> building area.) <br /> entrance (C.C.R., Title 24). ( . p <br /> (DevelopmentTitle Section 9-1015.3) <br /> f. LIGHTING: Lighting shall be provided and comply with the following: <br /> (1) If the parking area is to be used at night, parking lot and security lighting shall be installed. <br /> (DevelopmentTitle Section 9-1015.5[g]) <br /> -1 _ UP-01-7 <br /> Conditions of Approval <br /> f <br />