My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002160
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BACCHETTI
>
18344
>
2600 - Land Use Program
>
UP-01-07
>
SU0002160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 4:46:50 PM
Creation date
9/4/2019 10:11:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002160
PE
2626
FACILITY_NAME
UP-01-07
STREET_NUMBER
18344
Direction
S
STREET_NAME
BACCHETTI
STREET_TYPE
RD
City
TRACY
Zip
95376
ENTERED_DATE
10/23/2001 12:00:00 AM
SITE_LOCATION
18344 S BACCHETTI RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\B\BACCHETTI\18344\UP-01-07\SU0002160\APPL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(2) Any lighting shall be designed to confine direct rays to the premises. No spillover beyond the <br /> property lines shall be permitted except onto public thoroughfares,provided, however,that such <br /> light shall not cause a hazard to motorists. (DevelopmentTitie Section 9-1015.5[g][41) <br /> g. UNIFORM FIRE CODE:The following Uniform Fire Code and San Joaquin County Ordinance Code <br /> requirements will be applicable and shall be incorporated in the construction plans before submittal <br /> to the Community Development Department for a building permit. <br /> (1) Fire flow and hydrants will be provided for the proposed project by the use of. <br /> A. Public water mains(Appendix 11I-A and 111-B of the California Fire Code). <br /> B. Static water supply(NFPA 1231 of the National Fire Code). <br /> (2) Fire sprinkler systems shall be installed according to Article 10 of the California Fire Code and <br /> the appropriate standards and guides adopted in Chapter 35 of the California:Building Code and <br /> the California Electrical Code. <br /> (3) Fire department access roads shall be in accordance with Section 902.2 of the California Fire <br /> Code and the standards adopted by the San Joaquin County Fire Chiefs Association. <br /> (4) Key Boxes: A Knox box shall be installed according to the local fire department's instructions. <br /> (5) Fire extinguishers shall be installed in accordance with California Fire Code, Standard 10-1 of <br /> Volume 2. <br /> (6) Fire permits may be required prior to occupancy to conduct operations hazardous to life or <br /> property(CFC Section 105.2.1). <br /> (7) Mechanical refrigeration systems shall comply with all applicable codes(ammonia,etc.). <br /> 2. DEPARTMENT OF PUBLIC WORKS(Staff Contact:Gabriel Karam,468-3000) <br /> a. An encroachment permit shall be required for work within the road right-of-way. (DevelopmentTitie <br /> Sections 9-1145.4 and 9-1145.5) <br /> b. The driveway approach shall be improved in accordance with the requirements of San Joaquin <br /> County Standard R-17 prior to issuance of the occupancy permit. (Development Title Section 9- <br /> 1145.5) <br /> c. The Traffic Impact Mitigation Fee will be required for this development. The fee is due and payable <br /> at the time of building permit application. The fee currently is$182.19 per additional trip-end <br /> generated in the Tracy area. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record. A credit may <br /> be allowed if it can be verified that the existing developmenton this site was in operation on or after <br /> April 23, 1990. (Resolution R-00-433) <br /> d. A copy of the Final Site Plan shall be submitted prior to the release of building permits. <br /> e. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has <br /> met the requirements of the Waste Plan Format for Development Projects. The Final Site Pian is <br /> required upon submittal of verification. <br /> Conditions of Approval -2- UP-01-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.