My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004825 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BANTA
>
25122
>
2600 - Land Use Program
>
PA-0500048
>
SU0004825 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:31:15 AM
Creation date
9/4/2019 10:15:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0004825
PE
2622
FACILITY_NAME
PA-0500048
STREET_NUMBER
25122
Direction
S
STREET_NAME
BANTA
STREET_TYPE
RD
City
TRACY
APN
25022002
ENTERED_DATE
2/9/2005 12:00:00 AM
SITE_LOCATION
25122 S BANTA RD
RECEIVED_DATE
2/8/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BANTA\25122\PA-0500048\SU0004825\SS STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
= April 18, 2005 _ <br /> NOA Project Number:-E05008B <br /> 6.0 PERCOLATION TEST_INFORMATION <br /> 6.1 Percolation Test Locations <br /> A site map indicating the locations of the percolation test holes is included as Plate 1 of this report. <br /> 6.2 Number of Percolation Tests <br /> t One shallow percolation test was conducted on each proposed parcel of the Site, for a total of four <br /> ll shallow percolation tests. <br /> 6.3 Boring Preparation and Presaturation <br /> a hand au on February 23 2005. <br /> The soil borings were advanced on the Site with fur ry , <br /> "'A 1.5-inch diameter PVC pipe with perforations-on the bottom was used to measure the drop of <br /> _..t7 . <br /> :Approxitriately 2 inches of"pea gravel" were placed in the <br /> water in the percolation test boring. <br /> bottom of the open soil boring, then the PVC pipe was installed on top of the gravel. Several feet <br /> of"pea gravel" were backfilled in the annular space. <br /> Presaiuration of the percolation test holes on Parcels 3 and 4 occurred on March 1, 2005, <br /> FJpresaturation of the percolation test holes-on-Parcels 1-and-2 occurred on March 2, 2005.The depth <br /> of water used to pre-soak was 12 inches above the bottom of the boring.. <br /> 6.4 Condition of Borings After Presaturation <br /> l <br /> After the 24-hour soak period,the presaturated holes were found to be intact and dry on the day of <br /> testing. <br /> 6.5 Percolation Test Procedure <br /> Percolation tests for Parcels, an re conducted for the borings on March 2, 2005 in accordance <br /> with the requirements of the EHD. ,A percolation test with a duration of four hours was performed <br /> for each hole. The final half-hour of each four-hour percolation test was observed by Mr. Mike <br /> 'Escotto, Registered Environmental Health Specialist, EHD.. Percolation tests for Parcels 1 and 2 <br /> were conducted for the borings'on March 3, 2005 in accordance with the requirements of the EHD. <br /> FA percolation test with a duration.-of four-hours was performed for each hole. The final half-hour <br /> of each four-hopercolation test was observed by Mr. Mike Escotto,Registered Environmental <br /> ur <br /> Health Specialist,'F-HD. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.