Laserfiche WebLink
r; <br /> TABLE OF CONTENTS , <br /> ' 1.0 ADDITIONAL SITE CHARACTERIZATION <br /> 2.0 LATERAL DEFINITION OF THE GROUNDWATER PLUME <br /> t <br /> 2.1 Soil Boring <br /> 2.2 Monitoring Well Installation <br /> 3.0 VERTICAL DEFINITION OF THE GROUNDWATER PLUME <br /> 3.1 Well Location <br /> 3.2 Drilling and Sampling <br /> C3.3 Well Construction <br /> 4.0 SOIL AND GROUNDWATER SAMPLE ANALYSIS <br /> 4.1 Modified Groundwater Monitoring Well Sampling Procedure <br /> 4.2 Soil and Groundwater Analyses <br /> 4.3 Groundwater Monitoring <br /> 5.0 GEOTECHNICAL & GEOCHEMICAL TESTING <br /> !� 5.1 Lithologic Unit Testing Schedule <br /> 5.2 Geotechnical/Chemical Testing Parameters <br /> 5.3 Well Survey <br /> 5.4 Preliminary Fate and Transport Risk Assessment <br /> I <br /> 6.0 SCHEDULE & REPORTING <br /> 7.0 SIGNATURES AND CERTIFICATION <br /> List of Figures <br /> r1 Site Map 1 <br /> u Groundwater Gradient Rose Diagram .2 <br /> Monitoring Well Construction Schematic 3 <br /> Deep Monitoring Well Construction Schematic 4 <br /> CGeologic Cross Section 5 <br /> CList of Appendices <br /> �1 Summary Tables A <br /> L <br />