My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
7474
>
3500 - Local Oversight Program
>
PR0544800
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:20:02 AM
Creation date
9/4/2019 10:18:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544800
PE
3528
FACILITY_ID
FA0010235
FACILITY_NAME
AMERICAN TRUCK & TRAILER BODY CO
STREET_NUMBER
7474
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25020001
CURRENT_STATUS
02
SITE_LOCATION
7474 W ELEVENTH ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V <br /> CG.>afagicafTechnics 7m. `�` >1 Page 2 <br /> *&B Equipment <br /> Additional Site Characterization WP Addendum <br /> Project No. 336.2 <br /> April 7, 1997 <br /> 2.0 LATERAL DEFINITION OF THE GROUNDWATER PLUME <br /> .. The following work is proposed to define the lateral extent of the groundwater plume at C & <br /> B Equipment. Except where noted, all drilling and sampling will be conducted as per the <br /> Geological Technics Inc. June 15, 1996 Monitoring Well Installation and Groundwater <br /> Monitoring Work Plan. <br /> 2.1 Soil Boring <br /> To further investigate the extent of gasoline range petroleum hydrocarbons in the <br /> groundwater environment, Geological Technics Inc. proposes to install five exploratory <br /> borings, to be completed as monitoring wells, surrounding the point of release. The borings <br /> will be advanced using continuous flight hollow stem augers (HSA). <br /> Leh The HSA boreholes will be advanced to the capillary fringe and soil samples will be <br /> collected at 3 foot intervals down to the capillary fringe. In four of the borings, samples will <br /> 2 continue to be collected at five foot intervals, in order to define geology, to a total depth of 20 <br /> feet. Groundwater at this site ranges from approximately seven to eight feet below grade. <br /> �- For the fifth borehole see section 3.2 "Drilling and Sampling". <br /> 2.2 Monitoring Well Installation <br /> We propose to install four shallow monitoring wells screened through the water table (MW- <br /> 4-8) in order to define the lateral extent of the plume in the predominant down gradient and <br /> cross gradient directions from the point of release and to allow the detection of free phase <br /> `- floating product if present. <br /> The well boring will be drilled using a 8.0 inch outside diameter continuous flight hollow <br /> .. stem auger owned and operated by V&W Drilling (C579 720904). Soil cuttings will be <br /> placed in drums and stored on site until their disposition can be determined. <br /> MW-4-8 will be constructed using 2.0 inch diameter schedule 40 PVC casing with flush <br /> threads. A 15 foot screened interval will extend from 5 feet to 20 feet below surface grade <br /> (Figure 3 Well Construction Schematic). A #3 sand filter pack will surround and extend two <br /> eyfeet above the 0.020" screened interval. A granular bentonite transition seal will be installed <br /> �- r and hydrated. A surface seal will be achieved by pumping a neat cement grout (augmented <br /> b� 4 with < 4% bentonite) via a tremie tube. The well will be secured with a locking watertight <br /> cap encased in flush mounted traffic rated well box. <br /> After the well sealing materials have set (>24 hours) the well will be developed (using <br /> �►�� mechanical surging and pumping methods) until a clear stream of water is obtained. The <br /> well will be purged and groundwater samples collected no sooner than 24 hours after well <br /> development. All development and purge water will be containerized in 55 gallon DOT <br /> approved drums and stored on site until their disposition can be arranged. <br /> V <br /> V <br /> V <br />
The URL can be used to link to this page
Your browser does not support the video tag.