Laserfiche WebLink
C C 0 <br /> C� <br /> TABLE OF CONTENTS � <br /> 1.0 ADDITIONAL SITE CHARACTERIZATION <br /> L 2.0 LATERAL DEFINITION OF THE GROUNDWATER PLUME <br /> 2.1 Soil Boring and Discrete Water Sampling <br /> 2.2 SimulProbe Groundwater Sampling Procedure <br /> ry 2.3 Monitoring Well Installation <br /> 3.0 VERTICAL DEFINITION OF THE GROUNDWATER PLUME <br /> I- r' 3.1 Well Location <br /> �? 3.2 Drilling and Sampling <br /> C 3.3 Well Construction <br /> 3.4 Modified Groundwater Monitoring Well Sampling Procedure <br /> 3.5 Soil and Groundwater Analyses <br /> 3.6 Groundwater Monitoring <br /> 4.0 GEOTECHNICAL& GEOCHEMICAL TESTING <br /> 4.1 Lithologic Unit Testing Schedule j <br /> 4.2 Geotechnical/Chemical Testing Parameters <br /> Co4.3 Well Survey <br /> 4.4 Preliminary Fate and Transport Risk Assessment <br /> 5.0 SCHEDULE & REPORTING <br /> 6.0 SIGNATURES AND CERTIFICATION <br /> C <br /> List of Figures <br /> CSite Map 1 <br /> Groundwater Gradient Rose Diagram 2 <br /> Monitoring Well Construction Schematic 3 <br /> Deep Monitoring Well Construction Schematic 4 <br /> i <br /> Geologic Cross Section 5 <br /> List of Appendices <br /> L Summary Tables A <br />