Laserfiche WebLink
Ge (o 2n Page t <br /> C O Equipment <br /> Project No.: 336.2 <br /> May 16, 1997 <br /> Copies of the Work Plan and Addendum, SJCEHD correspondence, bids and an itemized budget <br /> spread sheet of costs for performing this work are enclosed for your review. <br /> Proposed Direction of Project <br /> The additional site characterization work plan with modifications as requested by SJCEHD <br /> includes the work outlined below. As this work is being performed and information is being <br /> obtained, GTI will evaluate it to determine if modifications should be made to streamline the <br /> investigative process and bring cost savings to the client and the Fund. <br /> Additional Site Characterization Work <br /> • prepare work plan & addendum <br /> • perform a well survey with in a 1000 foot radius <br /> • install 4 groundwater monitoring wells to further define the plumes lateral extent <br /> • install 1 deep groundwater monitoring wells to define vertical-extent of contamination <br /> • test soil samples as required from each borehole for TPH-G, BTEX, and MTBE <br /> • test selected soil samples for geophysical and geochemical parameters <br /> • test water samples from each monitoring well for TPH-G, BTEX, and MTBE <br /> • perform quarterly groundwater monitoring and reporting <br /> • perform monthly groundwater level measurements <br /> • perform a receptor survey, pathway and fate and transport evaluation <br /> • prepare a report summarizing the site characterization data <br /> Listed below is a proposed schedule for implementing this project. <br /> Proposed Bidding of Proiect <br /> To remain in compliance with the USTCFP, GTI requested V&W Drilling to prepare a bid for <br /> drilling and installing the 5 groundwater monitoring wells and SimulProbe to prepare a bid for <br /> use of their soil and pore water sampling tool. We have found V&W and SimulProbe to be very <br /> cost effective for three primary reasons: <br /> • reasonable charge rate, <br /> • fast drilling and sampling equipment, <br /> • well trained crew. <br /> These costs have been included in our budget spread sheet prepared giving estimated costs for <br /> performing the work approved by SJCEHD. The budget spread sheet is attached and shows <br /> itemized cost for the tasks proposed. In an attempt to make this Pre-Approval flow smoothly,we <br /> have used the same unit costs for this work that has previously been approved by the USTCFP <br /> for other projects. <br /> Geological Technics Inc. accepts field support services and lab invoices and adds a 15% <br /> overhead fee. We then pay these charges and assist our client complete the USTCFP <br /> reimbursement claim. Construction contractors will invoice our clients direct since GTI is not a <br /> licensed contractor. <br />