Laserfiche WebLink
i <br /> C jWicafTechnics Inc. Page 3 <br /> C&S Equipment <br /> Project No.: 336.2 <br /> May 16, 1997 fl <br /> Tentative Schedule for Implementing Work <br /> Task Description Schedule <br /> n <br /> • Receive directive from SJCEHD for additional work Jun 4, 1996 <br /> • Additional Site Characterization Work Plan Addendum submitted Apr 7,.1997 <br /> • Receive written approval of plan, w/modification from SJCEHD Feb 3, 1997 <br /> •. Prepare USTCFP Cost Pre-Approval for plan May 15, 1997 C <br /> • Receive approval of costs from USTCFP Jun 3, 1997 <br /> • Complete well survey work Jun 27, 1997 <br /> • Drill and install MW-4, 5, 6, 7, & 101 Jun 20, 1997 <br /> • Perform Summer GW monitoring event Jul 1 1997 �� <br /> • Prepare a Site Characterization Report Jul 26, 1997 <br /> I <br /> Thank you for your attention to this project. Call me if you have questions or need clarification. <br /> My phone number is (209) 538-6424. I <br /> Respectfully ubmitted, t <br /> Geologi Technics Inc. <br /> Raynold 1. Kablanow II, Ph.D. <br /> Vice President <br /> cc: Frank Coehlo - C&B <br /> Mary Meays - San Joaquin County <br /> Elizabeth Thayer- CRWQCB c <br /> g5jobsk b 3362km 36 rya 9105 doc s <br /> F <br /> f <br /> 1 <br /> }II <br /> I <br /> 1 <br />