Laserfiche WebLink
TABLE OF CONTENTS <br /> SOIL SUITABILITY STUDY ................................................................................. 1 <br /> Introduction ................................................................................................................. 1 <br /> ProposedDevelopment.............................................................................................. 1 <br /> SiteDescription........................................................................................................... 1 <br /> PastUses of the Site...................................................................................................2 <br /> Existing and Proposed Septic Tank Usage..............................................................2 <br /> ExistingSeptic System.............................................................................................. <br /> ProposedSeptic System........................................................................................... 2 <br /> On-Site Septic Permit History ..................•---............................................................. 2 <br /> Existing Septic Tank Usage in the Vicinity................................................................2 <br /> Septic Permit History in the Vicinity .......................................................................... 2 <br /> Expected On-Site Maximum Septic Tank Usage...................................................... 3 <br /> Ground Water Information ....................................................•-•••................................ 3 <br /> Depthand Gradient...................................................................................................3 <br /> Potential Ground Water Contamination Issues.........................................................3 <br /> On-Site Wells............................................................................................................3 <br /> WaterSample ...........................................................................................................4 <br /> Soil Profile and Geologic Information.......................................................................5 <br /> SoilBorings................ ..............................................................................................5 <br /> Discussion of Soil Lithology ............................................•......................................... 5 <br /> PercolationTest..........................................................................................................6 <br /> Preparation and Presaturation of Percolation Test Holes.........................................6 <br /> Percolation Test Procedure.......................................................................................6 <br /> PercolationTest Results...........................................................................................6 <br /> Discussion of Percolation Test Results..................................................................... 7 <br /> Discussion of Septic System Sizing.......................................................................... 7 <br /> CONCLUSIONS AND RECOMMENDATIONS.................................................... 8 <br /> LIMITATIONS ....................................................................................................... 9 <br /> SELECTED REFERENCES ............................................................................... 10 <br /> LOGE 1502 <br />