My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004126
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BIRD
>
35656
>
2600 - Land Use Program
>
QX-91-0005
>
SU0004126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2024 9:08:38 AM
Creation date
9/4/2019 10:27:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004126
FACILITY_NAME
QX-91-0005
STREET_NUMBER
35656
Direction
S
STREET_NAME
BIRD
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
35656 S BIRD RD
RECEIVED_DATE
11/18/1997 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\B\BIRD\35656\QX-91-05\SU0004126\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V. A Landscaping/Screening Plan shall be submitted to the Director for approval prior to <br /> initiation of the approved excavation. The Plan shall be consistent with the Landscape <br /> Plan in the Quarry Excavation application and indicate the following: I <br /> i <br /> (1) The landscaped berms on Blewett Road and Bird Road and other means of visual <br /> screening for the processing plant shall be installed during the first fall planting <br /> period following approval of the application and prior to the initiation of the use <br /> of the plant. <br /> (2) The processing plant shall be painted in a color to blend with the surrounding i <br /> terrain. <br /> I <br /> (3) Phase 2 of the excavation shall be screened from the view of Interstate 5 by the <br /> planting of dense evergreen shrubs between the rows of orchard trees in the 100- <br /> foot-wide buffer and shall be installed prior to the initiation of excavation of this <br /> phase. <br /> (4) Phases 6 and 7 shall be screened from the view of Interstate 5 by the planting <br /> of fast growing,tall evergreen shrubs within the 100-foot-wide buffer of Interstate <br /> 5 and the 50-toot-wide buffer of the Caldomia Aqueduct, and the shrubs shall be <br /> installed prior to the initiation of excavation of these phases. <br /> (5) The conveyor belt crossing over Interstate 5 and the Califamia Aqueduct for <br /> Phases 6 and 7 shall be designed and constructed to resemble the existing <br /> overpasses on Interstate S. As an alternative, the excavator may construct a <br /> tunnel crossing to provide visual attenuation. <br /> ' <br /> W. Operations shall be in accordance with instructions from the Agricultural Commissioner <br /> of San Joaquin County. (Development Title Section 9-1415.21h}) <br /> X. Project personnel shall be required to wear hard hats on the site. <br /> Y. The excavator shall be required to anchor processing facilities to the ground. <br /> Z. Except as otherwise provided in State Mining Regulations,the County shall have authority <br /> to enforce provisions of the Surface Mining and Reclamation Act. The County may <br /> exercise all enforcement regulations available under the County Development Title and <br /> the State Public Resources Code. Such enforcement measures include charging the <br /> applicant the costs of administering an enforcement action. The basis for charging fees <br /> for an enforcement action shall be a time and materials compensation. (Development <br /> Title Section 9-1415.2{t}) <br /> aa. Submit a Report of Waste Discharge (RWD) to the California Regional Water Quality <br /> Cornrol Board 180 days prior to the start of any activity on the site. <br /> bb. The owner shall defend, indemnify, and hold harmless the local agency or its agents, <br /> officers, and employees from any claim, action, or proceeding against the local agency <br /> or its agents, officers, or employees to attack, set aside, void, or annual an approval of <br /> the local agency, advisory agency, appeal board, or legislative body concerning this <br /> quarry excavation permit. <br /> Conditions of Approval - 9 - QX-91-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.